Loading ...
Sorry, an error occurred while loading the content.

105Solar Integration Workshop 2011 Aarhus, Denmark, Monday 24 October, 2011.

Expand Messages
  • Thomas Ackermann
    Sep 13, 2011
    • 0 Attachment

      Solar Integration Workshop
      and Tutorials on PV Systems and Grid Requirements

      The Solar Integration Workshop will be held for the first time in conjunction with the 10th International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Power Plants. It is part of the Renewable Energy Week Aarhus, Denmark and will be held on Monday 24 October, 2011.

      The Solar Integration Workshop brings together utilities, PV/CSP system developers and project developers, power systems operators and other professionals to exchange knowledge and ideas as well as experiences in matters relating to the integration of solar energy into the power systems. The program of the workshop consists of two parallel sessions and a closing panel discussion. The whole program is available for download here.

      Tutorials

      The Solar Integration Workshop is preceeded by Tutorials on PV Systems and Grid Requirements in the afternoon of Sunday 23 October, 2011. These are the subjects of the tutorials:

      • Modelling, diagnostics, and monitoring for PV arrays
      • PV inverter structures, topologies, and control
      • Grid Requirements for PV Systems and Grid Interactive PV Inverters
      For the detailed tutorial program see the workshop website.

      Registration

      The registration for the Solar Integration Workshop has entered its final phase. The participation fees and the link to the online registration can be found on the workshop's website.

      As well, you can register for the following events of the Renewable Energy Week Aarhus:
      • Oct. 24, 2011 - Wind Turbine Modeling Tutorials [Details]
      • Oct. 25 + 26, 2011 - Wind Integration Workshop [Details]
      • Oct. 25, 2011 - Workshop Dinner
      • Oct. 27, 2011 - Energinet.dk-day: The Danish TSO presents a roadmap leading to a wind based future from strategy to reality [Details]
      • Oct. 27, 2011 - Field trip A to the Siemens Wind turbine factory at Brande [Details]
      • Oct. 28, 2011 - Field trip B: Energinet.dk - Onshore construction sites of:
        • a) outdoor- plus first indoor substation and
        • b) offshore transformer platform [Details]
    • Show all 17 messages in this topic