Loading ...
Sorry, an error occurred while loading the content.
 

Re: [webanalytics] Re: Time on Site and Avg time on Sitecatalyst

Expand Messages
  • Warren Sander
    Setup a calculated metric in time format to show minutes/seconds -warren Warren Sander http://www.linkedin.com/in/warrensander warrensander@gmail.com 508 740
    Message 1 of 3 , Jul 18, 2013
      Setup a calculated metric in time format to show minutes/seconds

      -warren
      Warren Sander
      http://www.linkedin.com/in/warrensander
      warrensander@...
      508 740 9316
      On Jul 18, 2013 2:23 AM, "VaBeachKevin" <vabeachkevin@...> wrote:

      > **
      >
      >
      > Those values are based off a 100 scale. When you see 3.61, that doesn't
      > mean 3 minutes 61 seconds, but it means 3 minutes and 61 percent of another
      > minute, or 3:36. So .50 really means 30 seconds, .25 really means 15
      > seconds, .75 means 45 seconds, and so on.
      >
      > Kevin Rogers
      > @VaBeachKevin
      >
      >
      > --- In webanalytics@yahoogroups.com, "gadamoli" <gadamoli@...> wrote:
      > >
      > > hello,
      > >
      > > I have a question about TOS in SC.
      > >
      > > I have noticed that AVG time on site measured in minutes sometimes seems
      > to be 'odd', by providing 1.85 (minutes), 3.61 minutes and so on especially
      > for pages reports. Is this standard?
      > >
      > > Why would not just say 4.01 instead of 3.61?
      > >
      > >
      > > I contacted Omniture and I was told to check out this link
      > http://microsite.omniture.com/t2/help/en_US/reference/index.html#Time_Spent__Site_Sections_Calculation_Example
      > >
      > > to get the answer but I still do not fully understand.
      > >
      > > Any clarification/suggestion is appreciated.
      > >
      > > Gin
      > >
      >
      >
      >


      [Non-text portions of this message have been removed]
    Your message has been successfully submitted and would be delivered to recipients shortly.