Loading ...
Sorry, an error occurred while loading the content.

Remarkably bad luck accessing Butt Mtn

Expand Messages
  • Adam Helman
    Got this peak today - but not until after waiting 3 1/2 hours at the road repair control point. A 6 am road access time, posted at the CALTRANS website was
    Message 1 of 1 , Sep 13, 2013
    • 0 Attachment
      Got this peak today - but not until after waiting
      3 1/2 hours at the road repair control point.

      A 6 am road access time, posted at the
      CALTRANS website was impossible for
      the repair crew to meet - and so i waited
      until 9:40 am to access the Forest Service
      road leading to my trailhead.

      In the future i don't think it is a good use of time
      before leaving home to check on ALL the roads
      i could need over my journeys entire duration:
      the probability of an issue is tiny compared with
      the amount of time such an exercise would consume.

      Adam


      Sent from my iPhone
    Your message has been successfully submitted and would be delivered to recipients shortly.