Re: [hreg] Solar Plan in Austin

Expand Messages
  • mkewert
    I m surprised the cost of trackers is still trading well. I wonder if anyone has analyzed fixed panels pointed to produce most during utility peaks. Mike ...
    Message 1 of 6 , Feb 10, 2013
    • 0 Attachment
      I'm surprised the cost of trackers is still trading well. I wonder if anyone has analyzed fixed panels pointed to produce most during utility peaks.
      Mike


      From: "William S" <william.swann2@...>
      To: hreg@yahoogroups.com
      Sent: Sunday, February 10, 2013 8:57:20 AM
      Subject: [hreg] Solar Plan in Austin

       

      A study undertaken by solar proponents in Austin, concludes, and will recommend, that Austin implement 400-600 Mega Watts over the next 7 years. San Antonio has started on a project that will install 400 mega watts of trackers in 4 years. I assume tracking because the utilities need to address the cost of peak load.
      http://www.austintexas.gov/sites/default/files/files/City_Clerk/Associated_Entities/LSAC%20presentation%20FINAL%2020121115.pdf

    • William Swann
      I wondered about that also. I guess the additional solar harvested was attractive. The Spanish company - ercam.es - is setting up with robotic welders to weld
      Message 2 of 6 , Feb 10, 2013
      • 0 Attachment
        I wondered about that also. I guess the additional solar harvested was attractive. The Spanish company - ercam.es - is setting up with robotic welders to weld the trusses, upon which the panels are mounted.

        On Sunday, February 10, 2013, wrote:
         

        I'm surprised the cost of trackers is still trading well. I wonder if anyone has analyzed fixed panels pointed to produce most during utility peaks.
        Mike


        From: "William S" <william.swann2@...>
        To: hreg@yahoogroups.com
        Sent: Sunday, February 10, 2013 8:57:20 AM
        Subject: [hreg] Solar Plan in Austin

         

        A study undertaken by solar proponents in Austin, concludes, and will recommend, that Austin implement 400-600 Mega Watts over the next 7 years. San Antonio has started on a project that will install 400 mega watts of trackers in 4 years. I assume tracking because the utilities need to address the cost of peak load.
        http://www.austintexas.gov/sites/default/files/files/City_Clerk/Associated_Entities/LSAC%20presentation%20FINAL%2020121115.pdf

      • Jim Duncan
        Only the price of PV has dropped significantly, not their efficiency. So have tracker prices though not nearly as dramatically as PV. And using helical screw
        Message 3 of 6 , Feb 11, 2013
        • 0 Attachment

          Only the price of PV has dropped significantly, not their efficiency. So have tracker prices though not nearly as dramatically as PV. And using helical screw piers rather than concrete footings on megawatt arrays has kept costs for single axis trackers low enough that they are not becoming outdated any time soon. Granted the old one drive motor per ~kW of PV is way too costly but the economies of scale have helped keep the tracker market competitive.

           

          Jim Duncan

          North Texas Renewable Energy Inc

          www.ntrei.com

          NABCEP PV 031310-57

          TECL-27398

          ntrei@...

          817.917.0527

          NABCEP Logo

           

           

           

          From: hreg@yahoogroups.com [mailto:hreg@yahoogroups.com] On Behalf Of William Swann
          Sent: Sunday, February 10, 2013 3:03 PM
          To: hreg@yahoogroups.com
          Subject: Re: [hreg] Solar Plan in Austin

           

           

          I wondered about that also. I guess the additional solar harvested was attractive. The Spanish company - ercam.es - is setting up with robotic welders to weld the trusses, upon which the panels are mounted.

          On Sunday, February 10, 2013, wrote:

           

          I'm surprised the cost of trackers is still trading well. I wonder if anyone has analyzed fixed panels pointed to produce most during utility peaks.
          Mike


          From: "William S" <william.swann2@...>
          To: hreg@yahoogroups.com
          Sent: Sunday, February 10, 2013 8:57:20 AM
          Subject: [hreg] Solar Plan in Austin

           

          A study undertaken by solar proponents in Austin, concludes, and will recommend, that Austin implement 400-600 Mega Watts over the next 7 years. San Antonio has started on a project that will install 400 mega watts of trackers in 4 years. I assume tracking because the utilities need to address the cost of peak load.
          http://www.austintexas.gov/sites/default/files/files/City_Clerk/Associated_Entities/LSAC%20presentation%20FINAL%2020121115.pdf

        • William S
          Hello Mr Duncan, I noted some trackers on your website. Are those by Wattson? I am wondering how the power is transferred from the moving part to the
          Message 4 of 6 , Feb 11, 2013
          • 0 Attachment
            Hello Mr Duncan,
            I noted some trackers on your website. Are those by Wattson? I am wondering how the power is transferred from the moving part to the stationary post. Is that just a dangling chord, where cyclic bending of the conductors is minimized by a hanging chord, for lack of a better term?
            Bill S

            --- In hreg@yahoogroups.com, "Jim Duncan" wrote:
            >
            > Only the price of PV has dropped significantly, not their efficiency. So
            > have tracker prices though not nearly as dramatically as PV. And using
            > helical screw piers rather than concrete footings on megawatt arrays has
            > kept costs for single axis trackers low enough that they are not becoming
            > outdated any time soon. Granted the old one drive motor per ~kW of PV is way
            > too costly but the economies of scale have helped keep the tracker market
            > competitive.
            >
            >
            >
            > Jim Duncan
            >
            > North Texas Renewable Energy Inc
            >
            > www.ntrei.com
            >
            > NABCEP PV 031310-57
            >
            > TECL-27398
            >
            > ntrei@...
            >
            > 817.917.0527
            >
            > NABCEP Logo
            >
            >
            >
            >
            >
            >
            >
            > From: hreg@yahoogroups.com [mailto:hreg@yahoogroups.com] On Behalf Of
            > William Swann
            > Sent: Sunday, February 10, 2013 3:03 PM
            > To: hreg@yahoogroups.com
            > Subject: Re: [hreg] Solar Plan in Austin
            >
            >
            >
            >
            >
            > I wondered about that also. I guess the additional solar harvested was
            > attractive. The Spanish company - ercam.es - is setting up with robotic
            > welders to weld the trusses, upon which the panels are mounted.
            >
            > On Sunday, February 10, 2013, wrote:
            >
            >
            >
            > I'm surprised the cost of trackers is still trading well. I wonder if anyone
            > has analyzed fixed panels pointed to produce most during utility peaks.
            > Mike
            >
            >
            > _____
            >
            >
            > From: "William S"
            > To: hreg@yahoogroups.com
            > Sent: Sunday, February 10, 2013 8:57:20 AM
            > Subject: [hreg] Solar Plan in Austin
            >
            >
            >
            > A study undertaken by solar proponents in Austin, concludes, and will
            > recommend, that Austin implement 400-600 Mega Watts over the next 7 years.
            > San Antonio has started on a project that will install 400 mega watts of
            > trackers in 4 years. I assume tracking because the utilities need to address
            > the cost of peak load.
            > http://www.austintexas.gov/sites/default/files/files/City_Clerk/Associated_E
            > ntities/LSAC%20presentation%20FINAL%2020121115.pdf
            >
          • Jim Duncan
            The 4 trackers are from Zomeworks, 2040 Watts each. 24x85Watt Spire modules. The system is one we built in 2006 south of Glen Rose. Jim Duncan North Texas
            Message 5 of 6 , Feb 11, 2013
            • 0 Attachment

              The 4 trackers are from Zomeworks, 2040 Watts each. 24x85Watt Spire modules. The system is one we built in 2006 south of Glen Rose.

               

              Jim Duncan

              North Texas Renewable Energy Inc

              www.ntrei.com

              NABCEP PV 031310-57

              TECL-27398

              ntrei@...

              817.917.0527

              NABCEP Logo

               

               

               

              From: hreg@yahoogroups.com [mailto:hreg@yahoogroups.com] On Behalf Of William Swann
              Sent: Sunday, February 10, 2013 3:03 PM
              To: hreg@yahoogroups.com
              Subject: Re: [hreg] Solar Plan in Austin

               

               

              I wondered about that also. I guess the additional solar harvested was attractive. The Spanish company - ercam.es - is setting up with robotic welders to weld the trusses, upon which the panels are mounted.

              On Sunday, February 10, 2013, wrote:

               

              I'm surprised the cost of trackers is still trading well. I wonder if anyone has analyzed fixed panels pointed to produce most during utility peaks.
              Mike


              From: "William S" <william.swann2@...>
              To: hreg@yahoogroups.com
              Sent: Sunday, February 10, 2013 8:57:20 AM
              Subject: [hreg] Solar Plan in Austin

               

              A study undertaken by solar proponents in Austin, concludes, and will recommend, that Austin implement 400-600 Mega Watts over the next 7 years. San Antonio has started on a project that will install 400 mega watts of trackers in 4 years. I assume tracking because the utilities need to address the cost of peak load.
              http://www.austintexas.gov/sites/default/files/files/City_Clerk/Associated_Entities/LSAC%20presentation%20FINAL%2020121115.pdf