Loading ...
Sorry, an error occurred while loading the content.

Compact Linear Fresnel Reflectors, or CLFR

Expand Messages
  • William S
    Power Engineering Magazine takes us on a tour of the Kimberlina plant with AREVA Solar s Bill Conlan. The description states that the plant cost about $3 per
    Message 1 of 1 , Sep 30, 2012
    • 0 Attachment
      Power Engineering Magazine takes us on a tour of the Kimberlina plant with AREVA Solar's Bill Conlan. The description states that the plant cost about $3 per watt to build. Fuel cost = 0.0
      http://www.renewableenergyworld.com/rea/news/article/2010/11/inside-a-linear-fresnel-solar-power-plantThe link is <>
    Your message has been successfully submitted and would be delivered to recipients shortly.