Re: [greenwichcyclists] Thames Cycle path

Expand Messages
  • Isobel Stoddart
    Dear Liz Thank you for your comments. You may have seen some of the previous correspondence about the opening of Woolwich Arsenal (the section immediately east
    Message 1 of 6 , Sep 30, 2000
    • 0 Attachment
      Dear Liz

      Thank you for your comments. You may have seen some of the previous
      correspondence about the opening of Woolwich Arsenal (the section
      immediately east of the Waterfront). We are working hard, with Greenwich
      Cyclists, the council and the Development Agency to get this section opened
      as soon as possible - some outstanding issues re. construction of some
      buildings and new pier at western end of site.

      The signing for the Thames Cycle Route has not yet been installed by
      Greenwich Council. My understanding is that the route will be signed within
      the next two months. The signs that you followed (red stickers) are a very
      interim, stop gap measure until the proper signing is installed.

      The old Cubow site (Mast Pond Wharf?) immediately to the west of the
      Woolwich Ferry is due for redevelopment. In the long term the site will
      incorporate a riverside walk/cycle way with bridges over the two drawdocks
      on the site. We are currently talking to the developer, architect about
      introducing an interim site. We had a site visit early last week and
      Greenwich Council are preparing a cost/design for the interim route.

      Hope this answers your questions.

      Thanks

      Isobel Stoddart

      cc. Katie Dickson - for your information.

      -----Original Message-----
      From: Liz Delap <liz.delap@...>
      To: greenwichcyclists@egroups.com <greenwichcyclists@egroups.com>
      Date: 30 September 2000 00:41
      Subject: Re: [greenwichcyclists] Thames Cycle path


      >I tried the Thames path last Sunday. There are still diversions almost
      >immediately after the Waterfront. You are taken back onto the dual
      >carriageway but can walk down some shallow steps (just before Loolwich
      >college) and go through a housing estate towards the river. You pick up
      the
      >sustrans signs again just before some waste ground and get back onto the
      >river front. All fine then (although not many sustrans signs) until past
      >Thamesmead central (clocktowe). I turned off about a mile after that but
      >the path looks as though it goes on. Does anybody know what plans (if any)
      >there are for the old Cubow yard site just before the ferry ?
      >
      >Liz Delap
      >
      >-----Original Message-----
      >From: Tony Fullbrook <TonyFullbrook@...>
      >To: greenwichcyclists@egroups.com <greenwichcyclists@egroups.com>
      >Date: 28 September 2000 21:56
      >Subject: [greenwichcyclists] Thames Cycle path
      >
      >
      >>Does anyone know how far down river from Woolwich it is now possible to
      >>ride? Has the path now been fully opened beyond the Waterfront Centre
      going
      >>down river? I've heard rumour you can ride as far as Erith - I am
      >interested
      >>in riding down to the Dartford Bridge - is this possible?
      >>
      >>Look forward to hearing from anyone in the know!
      >>
      >>Cheers
      >>
      >>Tony
      >>
      >>
      >>
      >>
      >>
      >>_______________________________________________________
      >> Get 100% private, FREE email for life from Excite UK
      >> Visit http://inbox.excite.co.uk/
      >>
      >>
      >>
      >>To unsubscribe from this group, send an email to:
      >>greenwichcyclists-unsubscribe@egroups.com
      >>
      >>
      >>
      >
      >
      >
      >To unsubscribe from this group, send an email to:
      >greenwichcyclists-unsubscribe@egroups.com
      >
      >
      >
      >
      >
      >