    All: Boiler and water heater now overdue for delivery. We ll continue construction at our new home site at 23 Russell Street (corner of Russell and Maple
    Message 1 of 2 , Apr 4, 2011
    • 0 Attachment
      All:

      Boiler and water heater now overdue for delivery. We'll continue construction at our new home site at 23 Russell Street (corner of Russell and Maple Streets) in Wilton.


      >> Thursday: Meet at 23 Russell Street, Wilton. Please bring lunches. Due to small crew sizes shortly before we suspended work while awaiting the boiler, please confirm intent to volunteer to Tom LaRochelle (dotomlar@... ).


      >> Saturday: Meet at 23 Russell Street, Wilton. Please bring lunches.


      Directions from NH-101A, heading WEST out of Nashua:
      Turn LEFT after NH-101 overpass to take the RT-101 W ramp toward PETERBOROUGH/KEENE, merging onto NH-101 (Milford bypass). 4.9 mi to - Turn LEFT onto ELM ST/NH-101. 0.8 mi to - Turn (bear) RIGHT onto WILTON RD. 0.5 mi to - WILTON RD becomes MAIN ST. 0.3 mi to - Turn RIGHT onto RUSSELL ST. 0.1 mi to - End at site on the RIGHT, corner RUSSELL ST & MAPLE ST.


      Volunteer work:

      - Move staging to outdoor storage in Brookline.
      - Move the laminate flooring from the back of the truck to the trailer.
      - If / when plumbing inspection complete, finish drywalling in bathroom, and install vanity base.
      - Start punch list / touch-up, including trim on the two northwest corner windows, fire-sealing plumbing penetrations.



      See as many of you as can make it, starting by 9:00.



      Completed since last Saturday:
      23 Russell Street, Wilton: Arranged for boiler / water heater delivery. Cleared east end of basement of staging to make way for the boiler. Installed range exhaust and hood. Finished painting touchup in bedrooms, around closet doors. Started installing laminate floor as the house has warmed. Installed storm doors. Photos posted to our Web-based Picasa album: http://picasaweb.google.com/nashabitat/RussellSt# .
      24 Adelaide Street, Hudson: Awaiting end of Zoning Board variance 30-day appeal period.




      Upcoming events:
      23 Russell Street, Wilton: Continue construction. Still seeking donations / deals for punch list items.
      24 Adelaide Street, Hudson: Refine plans for 2011 renovation / addition, variance from ZBA. Seeking donations / deals.
      Nashua Children's Home, 125 Amherst St., Nashua: Replace ramp (planning spring 2011).
      Other small projects being coordinated.


      eric
      Cell: 620-4182
    • Moore, Eric C (US SSA)
      Thursday volunteers - no need to confirm with Tom. FYI, Eric Jensen will be at the site then - the boiler is due tomorrow. eric ... From: Moore, Eric C (US
      Message 2 of 2 , Apr 6, 2011
      • 0 Attachment
        Thursday volunteers - no need to confirm with Tom. FYI, Eric Jensen will be at the site then - the boiler is due tomorrow. eric

        -----Original Message-----
        From: Moore, Eric C (US SSA)
        Sent: Monday, April 04, 2011 8:06 PM
        To: 'dotomlar@...'; 'Timhaven@...'; 'rhall_39691@...'; 'racmar@...'; 'mtereshko@...'; 'mardenw@...'; 'gsankar@...'; 'georgecmartin@...'; 'chris_millette@...'; 'ceraare@...'; 'brboyer@...'; 'crjjw@...'; 'watt50k@...'; 'nelsonandrew@...'; 'Bradflint@...'; 'newtexcal@...'; 'imag1327@...'; 'bbaron1@...'; 'catlady249@...'; 'Larryberube@...'; 'roger.hall@...'; 'cpannand@...'; 'aspireunity4@...'; 'jmccarth2003@...'; 'mscohen51@...'; 'dvh1938@...'; 'nh_golfer@...'; 'chesterrec@...'; 'g.argon@...'; 'gods-knight-1@...'; 'strom_eric@...'; 'nseher@...'; 'michaeljokeefe@...'
        Cc: 'NODAYRAY@...'; 'harrow@...'; 'jerry.harrow@...'; 'TheRogersGang@...'; 'office@...'; 'paulymac@...'; 'erniehat@...'; 'chipz@...'; 'JodyLCorbett@...'; 'tbarker@...'; 'gnhfh@yahoogroups.com'; 'gmhfh@...'; 'tammyjrobertson@...'; 'Social Media and Website'
        Subject: Habitat for Humanity build - Thursday April 7th / Saturday April 9th

        All:

        Boiler and water heater now overdue for delivery. We'll continue construction at our new home site at 23 Russell Street (corner of Russell and Maple Streets) in Wilton.


        >> Thursday: Meet at 23 Russell Street, Wilton. Please bring lunches. Due to small crew sizes shortly before we suspended work while awaiting the boiler, please confirm intent to volunteer to Tom LaRochelle (dotomlar@... ).


        >> Saturday: Meet at 23 Russell Street, Wilton. Please bring lunches.


        Directions from NH-101A, heading WEST out of Nashua:
        Turn LEFT after NH-101 overpass to take the RT-101 W ramp toward PETERBOROUGH/KEENE, merging onto NH-101 (Milford bypass). 4.9 mi to - Turn LEFT onto ELM ST/NH-101. 0.8 mi to - Turn (bear) RIGHT onto WILTON RD. 0.5 mi to - WILTON RD becomes MAIN ST. 0.3 mi to - Turn RIGHT onto RUSSELL ST. 0.1 mi to - End at site on the RIGHT, corner RUSSELL ST & MAPLE ST.


        Volunteer work:

        - Move staging to outdoor storage in Brookline.
        - Move the laminate flooring from the back of the truck to the trailer.
        - If / when plumbing inspection complete, finish drywalling in bathroom, and install vanity base.
        - Start punch list / touch-up, including trim on the two northwest corner windows, fire-sealing plumbing penetrations.



        See as many of you as can make it, starting by 9:00.



        Completed since last Saturday:
        23 Russell Street, Wilton: Arranged for boiler / water heater delivery. Cleared east end of basement of staging to make way for the boiler. Installed range exhaust and hood. Finished painting touchup in bedrooms, around closet doors. Started installing laminate floor as the house has warmed. Installed storm doors. Photos posted to our Web-based Picasa album: http://picasaweb.google.com/nashabitat/RussellSt# .
        24 Adelaide Street, Hudson: Awaiting end of Zoning Board variance 30-day appeal period.




        Upcoming events:
        23 Russell Street, Wilton: Continue construction. Still seeking donations / deals for punch list items.
        24 Adelaide Street, Hudson: Refine plans for 2011 renovation / addition, variance from ZBA. Seeking donations / deals.
        Nashua Children's Home, 125 Amherst St., Nashua: Replace ramp (planning spring 2011).
        Other small projects being coordinated.