    All: This Saturday, we re planning three very small indoor jobs. For planning, we ll handle them in the following order, but will consider parallel work
    Message 1 of 3 , Oct 6, 2008
    • 0 Attachment

      All:

       

      This Saturday, we’re planning three very small indoor jobs. For planning, we’ll handle them in the following order, but will consider parallel work depending on volunteer availability on Saturday.

       

      (1) 53 Arlington Street, Nashua. Shore up basement beam that is not supporting the living area floor above

       

      (2) 34 New Searles Street, Nashua. Add handicapped grab bars on either side of the main hallway at the top of the basement stairs.

       

      (3) 58 Parkhurst Rd., Merrimack. Install plastic sheeting over insulation on basement ceiling to evaluate possible cause of allergies.  

       

       

      Directions to 53 Arlington from Everett Turnpike (US3) Exit 4:

       

      NORTHEAST on KINSLEY ST/NH-111 E.  1.5 mi

      Turn RIGHT onto MAIN ST/DANIEL WEBSTER HWY.  0.1 mi   

      Turn LEFT onto BOWERS ST.  0.7 mi

      Turn RIGHT onto ARLINGTON ST.  0.1 mi

      End at 53 Arlington St on right (after Williams St)

       

      And in case some aren’t available until a bit later in the day –

       

      Directions from 53 Arlington to 34 New Searles:

       

      SOUTHEAST on ARLINGTON ST toward MCKEAN ST.  0.0 mi

      Turn RIGHT onto MCKEAN ST.  0.3 mi

      Turn LEFT onto ALLDS ST.  0.6 mi

      Turn LEFT onto MAIN ST/ DANIEL WEBSTER HWY.  0.5 mi

      Turn SLIGHT RIGHT onto E DUNSTABLE RD.  1.6 mi

      Turn RIGHT onto NEW SEARLES RD.  0.3 mi

      End at 34 New Searles Rd on left

       

      Directions from 34 New Searles to 58 Parkhurst:

       

      NORTHEAST on NEW SEARLES RD toward SHADY LN.  0.3 mi

      Turn LEFT onto E DUNSTABLE RD.  0.8 mi

      Turn LEFT to take the EVERETT TURNPIKE NORTH/ US-3 N ramp toward MANCHESTER.  0.4 mi

      Merge onto EVERETT TURNPIKE (Portions toll).  7.0 mi

      Take EXIT 11 toward US-3/ MERRIMACK.  0.5 mi

      Turn LEFT onto GREELEY ST.  0.1 mi

      GREELEY ST becomes CONTINENTAL BLVD.  0.1 mi

      Turn RIGHT onto AMHERST RD.  0.3 mi

      Turn RIGHT onto TURKEY HILL RD.  2.0 mi

      Stay STRAIGHT to go onto MCQUESTION RD.  1.0 mi

      MCQUESTION RD becomes BABOOSIC LAKE RD.  0.6 mi

      Turn RIGHT onto BEAN RD.  0.4 mi

      Stay STRAIGHT to go onto WOODWARD RD.  1.5 mi

      Turn LEFT onto PARKHURST RD.  0.3 mi

      End at 58 Parkhurst Rd Merrimack

       

       

       

      See as many of you as can make it, starting around 9:00 AM.

       

       

       

       

       

      Completed since last weekend:

       

      (4 Dutton Street, Manchester) Built railings for stairs off front door decks. Installed stairs at side exit. Helped with inside work.

       

       

       

      Upcoming events:

       

      7-1/2 Ridge Street zoning variance hearing 10/14/2008

      Building permit, 7-1/2 Ridge Street

      Connect temporary power (7-1/2 Ridge Street, Nashua)

      Other small projects being coordinated

       

       

      eric

      Cell: 620-4182

    • Moore, Eric C (US SSA)
      If anyone who was planning to volunteer on Saturday lives in the vicinity of the 3rd stop in Merrimack, and would like to lead and/or work on that effort in
      Message 2 of 3 , Oct 8, 2008
      • 0 Attachment

        If anyone who was planning to volunteer on Saturday lives in the vicinity of the 3rd stop in Merrimack, and would like to lead and/or work on that effort in parallel, please contact me (cell 620-4182) and I’ll try to coordinate material / tools in advance.

         

        Also, I’ve tweaked the directions below – they really start from Exit 5E, not 4 as originally stated.

         

        eric

         


        From: Moore, Eric C (US SSA)
        Sent: Monday, October 06, 2008 7:07 PM
        To: 'Tom LaRochelle'; 'Tim Dawson'; 'rhall_39691@...'; 'racmar@...'; 'Mike Tereshko'; 'mardenw@...'; 'gsankar@...'; 'georgecmartin@...'; 'David Alley'; 'Chris Millette'; 'ceraare@...'; 'brboyer@...'; 'Roy Wall'; 'Christina Zlotnick'; 'Andrew Nelson'; 'Ron Dyer'; 'Bradflint@...'; 'newtexcal@...'; 'doug@...'; 'imag1327@...'; 'clennox@...'; 'bbaron1@...'; 'Helen Gonzalez'; 'Larryberube@...'; 'roger.hall@...'; 'Charlie Annand'; 'sheilap@...'; 'Crawford, Eric W'; 'aspireunity4@...'; 'COMPLETECUSTOMREMODELING@...'; 'alext514@...'; 'jmccarth2003@...'; 'mscohen51@...'; 'dvh1938@...'; 'nh_golfer@...'; 'chesterrec@...'; 'Goner Argon'; 'arlelect@...'; 'steve@...'; 'a.b.plumbing@...'; 'Missy'; 'dmcbikes@...'; 'vwoo@...'; 'prughjm@...'; 'aelbarnes@...'; 'steve@...'; 'Tyler Lawrence'; 'fucowe@...'; 'ers03063@...'; 'bmitchel@...'; 'buddickson@...'; 'Tom@...'; 'b-jgallo@...'; 'Dana MacAllister'
        Cc: 'NODAYRAY@...'; 'Jerry & Karen Harrow'; 'Harrow, Jerry'; 'TheRogersGang@...'; 'Nashabitat@...'; 'Paul McLaughlin'; 'Vicki Hatfield'; 'bglover@...'; 'chipz@...'; 'JodyLCorbett@...'; 'tbarker@...'; 'gnhfh@yahoogroups.com'; 'gmhfh@...'
        Subject: Habitat for Humanity build - Saturday October 11th

         

        All:

         

        This Saturday, we’re planning three very small indoor jobs. For planning, we’ll handle them in the following order, but will consider parallel work depending on volunteer availability on Saturday.

         

        (1) 53 Arlington Street, Nashua. Shore up basement beam that is not supporting the living area floor above

         

        (2) 34 New Searles Street, Nashua. Add handicapped grab bars on either side of the main hallway at the top of the basement stairs.

         

        (3) 58 Parkhurst Rd., Merrimack. Install plastic sheeting over insulation on basement ceiling to evaluate possible cause of allergies.  

         

         

        Directions to 53 Arlington from Everett Turnpike (US3) Exit 5E:

         

        NORTHEAST on KINSLEY ST/NH-111 E.  1.5 mi

        Turn RIGHT onto MAIN ST/DANIEL WEBSTER HWY.  0.1 mi   

        Turn LEFT onto BOWERS ST.  0.7 mi

        Turn RIGHT onto ARLINGTON ST.  0.1 mi

        End at 53 Arlington St on right (after Williams St)

         

        And in case some aren’t available until a bit later in the day –

         

        Directions from 53 Arlington to 34 New Searles:

         

        SOUTHEAST on ARLINGTON ST toward MCKEAN ST.  0.0 mi

        Turn RIGHT onto MCKEAN ST.  0.3 mi

        Turn LEFT onto ALLDS ST.  0.6 mi

        Turn LEFT onto MAIN ST/ DANIEL WEBSTER HWY.  0.5 mi

        Turn SLIGHT RIGHT onto E DUNSTABLE RD.  1.6 mi

        Turn RIGHT onto NEW SEARLES RD.  0.3 mi

        End at 34 New Searles Rd on left

         

        Directions from 34 New Searles to 58 Parkhurst:

         

        NORTHEAST on NEW SEARLES RD toward SHADY LN.  0.3 mi

        Turn LEFT onto E DUNSTABLE RD.  0.8 mi

        Turn LEFT to take the EVERETT TURNPIKE NORTH/ US-3 N ramp toward MANCHESTER.  0.4 mi

        Merge onto EVERETT TURNPIKE (Portions toll).  7.0 mi

        Take EXIT 11 toward US-3/ MERRIMACK.  0.5 mi

        Turn LEFT onto GREELEY ST.  0.1 mi

        GREELEY ST becomes CONTINENTAL BLVD.  0.1 mi

        Turn RIGHT onto AMHERST RD.  0.3 mi

        Turn RIGHT onto TURKEY HILL RD.  2.0 mi

        Stay STRAIGHT to go onto MCQUESTION RD.  1.0 mi

        MCQUESTION RD becomes BABOOSIC LAKE RD.  0.6 mi

        Turn RIGHT onto BEAN RD.  0.4 mi

        Stay STRAIGHT to go onto WOODWARD RD.  1.5 mi

        Turn LEFT onto PARKHURST RD.  0.3 mi

        End at 58 Parkhurst Rd Merrimack

         

         

         

        See as many of you as can make it, starting around 9:00 AM.

         

         

         

         

         

        Completed since last weekend:

         

        (4 Dutton Street, Manchester) Built railings for stairs off front door decks. Installed stairs at side exit. Helped with inside work.

         

         

         

        Upcoming events:

         

        7-1/2 Ridge Street zoning variance hearing 10/14/2008

        Building permit, 7-1/2 Ridge Street

        Connect temporary power (7-1/2 Ridge Street, Nashua)

        Other small projects being coordinated

         

         

        eric

        Cell: 620-4182

      • Moore, Eric C (US SSA)
        All: We re planning to handle these three sites in parallel. I ll be at 53 Arlington Street... Roger Hall will be at 34 New Searles ~8:45 and will need at
        Message 3 of 3 , Oct 10, 2008
        • 0 Attachment

          All:

           

          We’re planning to handle these three sites in parallel.

           

          I’ll be at 53 Arlington Street…

           

          Roger Hall will be at 34 New Searles ~8:45 and will need at least one helper.

           

          Dennis McGivern will be at 58 Parkhurst ~9:00. We’ve got a couple of helpers lined up.

           

          See you tomorrow.

           

          eric

           


          From: gnhfh@yahoogroups.com [mailto:gnhfh@yahoogroups.com] On Behalf Of Moore, Eric C (US SSA)
          Sent: Wednesday, October 08, 2008 7:26 PM
          To: Tom LaRochelle; Tim Dawson; rhall_39691@...; racmar@...; Mike Tereshko; mardenw@...; gsankar@...; georgecmartin@...; David Alley; Chris Millette; ceraare@...; brboyer@...; Roy Wall; Christina Zlotnick; Andrew Nelson; Ron Dyer; Bradflint@...; newtexcal@...; doug@...; imag1327@...; clennox@...; bbaron1@...; Helen Gonzalez; Larryberube@...; roger.hall@...; Charlie Annand; sheilap@...; Crawford, Eric W; aspireunity4@...; COMPLETECUSTOMREMODELING@...; alext514@...; jmccarth2003@...; mscohen51@...; dvh1938@...; nh_golfer@...; chesterrec@...; Goner Argon; arlelect@...; steve@...; a.b.plumbing@...; Missy; dmcbikes@...; vwoo@...; prughjm@...; aelbarnes@...; steve@...; Tyler Lawrence; fucowe@...; ers03063@...; bmitchel@...; buddickson@...; Tom@...; b-jgallo@...; Dana MacAllister
          Cc: NODAYRAY@...; Jerry & Karen Harrow; Harrow, Jerry; TheRogersGang@...; Nashabitat@...; Paul McLaughlin; Vicki Hatfield; bglover@...; chipz@...; JodyLCorbett@...; tbarker@...; gnhfh@yahoogroups.com; gmhfh@...
          Subject: [GNHFH] RE: Habitat for Humanity build - Saturday October 11th

           

          If anyone who was planning to volunteer on Saturday lives in the vicinity of the 3rd stop in Merrimack, and would like to lead and/or work on that effort in parallel, please contact me (cell 620-4182) and I’ll try to coordinate material / tools in advance.

           

          Also, I’ve tweaked the directions below – they really start from Exit 5E, not 4 as originally stated.

           

          eric

           


          From: Moore, Eric C (US SSA)
          Sent: Monday, October 06, 2008 7:07 PM
          To: 'Tom LaRochelle'; 'Tim Dawson'; 'rhall_39691@ netzero.net' ; 'racmar@webtv. net'; 'Mike Tereshko'; 'mardenw@comcast. net'; 'gsankar@umich. edu'; 'georgecmartin@ email.com' ; 'David Alley'; 'Chris Millette'; 'ceraare@comcast. net'; 'brboyer@statestree t.com'; 'Roy Wall'; 'Christina Zlotnick'; 'Andrew Nelson'; 'Ron Dyer'; 'Bradflint@gmail. com'; 'newtexcal@aol. com'; 'doug@dovetailcusto mhomes.com' ; 'imag1327@yahoo. com'; 'clennox@verizon. net'; 'bbaron1@msn. com'; 'Helen Gonzalez'; 'Larryberube@ msn.com'; 'roger.hall@ philips.com' ; 'Charlie Annand'; 'sheilap@spooner- nh.com'; 'Crawford, Eric W'; 'aspireunity4@ yahoo.com' ; 'COMPLETECUSTOMREMO DELING@msn. com'; 'alext514@gmail. com'; 'jmccarth2003@ curry.edu' ; 'mscohen51@comcast. net'; 'dvh1938@comcast. net'; 'nh_golfer@yahoo. com'; 'chesterrec@ gsinet.net' ; 'Goner Argon'; 'arlelect@juno. com'; 'steve@rancourtente rprises.com' ; 'a.b.plumbing@ gmail.com' ; 'Missy'; 'dmcbikes@yahoo. com'; 'vwoo@...' ; 'prughjm@aol. com'; 'aelbarnes@comcast. net'; 'steve@delfossenh. com'; 'Tyler Lawrence'; 'fucowe@hotmail. com'; 'ers03063@comcast. net'; 'bmitchel@mitre. org'; 'buddickson@ gmail.com' ; 'Tom@marker42. com'; 'b-jgallo@comcast. net'; 'Dana MacAllister'
          Cc: 'NODAYRAY@aol. com'; 'Jerry & Karen Harrow'; 'Harrow, Jerry'; 'TheRogersGang@ aol.com'; 'Nashabitat@ verizon.net' ; 'Paul McLaughlin'; 'Vicki Hatfield'; 'bglover@nashabitat .org'; 'chipz@pobox. com'; 'JodyLCorbett@ aol.com'; 'tbarker@authenticc onstruction. com'; 'gnhfh@yahoogroups. com'; 'gmhfh@verizon. net'
          Subject: Habitat for Humanity build - Saturday October 11th

           

          All:

           

          This Saturday, we’re planning three very small indoor jobs. For planning, we’ll handle them in the following order, but will consider parallel work depending on volunteer availability on Saturday.

           

          (1) 53 Arlington Street, Nashua. Shore up basement beam that is not supporting the living area floor above

           

          (2) 34 New Searles Street, Nashua. Add handicapped grab bars on either side of the main hallway at the top of the basement stairs.

           

          (3) 58 Parkhurst Rd., Merrimack. Install plastic sheeting over insulation on basement ceiling to evaluate possible cause of allergies.  

           

           

          Directions to 53 Arlington from Everett Turnpike (US3) Exit 5E:

           

          NORTHEAST on KINSLEY ST/NH-111 E.  1.5 mi

          Turn RIGHT onto MAIN ST/DANIEL WEBSTER HWY.  0.1 mi   

          Turn LEFT onto BOWERS ST.  0.7 mi

          Turn RIGHT onto ARLINGTON ST.  0.1 mi

          End at 53 Arlington St on right (after Williams St)

           

          And in case some aren’t available until a bit later in the day –

           

          Directions from 53 Arlington to 34 New Searles:

           

          SOUTHEAST on ARLINGTON ST toward MCKEAN ST.  0.0 mi

          Turn RIGHT onto MCKEAN ST.  0.3 mi

          Turn LEFT onto ALLDS ST.  0.6 mi

          Turn LEFT onto MAIN ST/ DANIEL WEBSTER HWY.  0.5 mi

          Turn SLIGHT RIGHT onto E DUNSTABLE RD.  1.6 mi

          Turn RIGHT onto NEW SEARLES RD.  0.3 mi

          End at 34 New Searles Rd on left

           

          Directions from 34 New Searles to 58 Parkhurst:

           

          NORTHEAST on NEW SEARLES RD toward SHADY LN.  0.3 mi

          Turn LEFT onto E DUNSTABLE RD.  0.8 mi

          Turn LEFT to take the EVERETT TURNPIKE NORTH/ US-3 N ramp toward MANCHESTER.  0.4 mi

          Merge onto EVERETT TURNPIKE (Portions toll).  7.0 mi

          Take EXIT 11 toward US-3/ MERRIMACK.  0.5 mi

          Turn LEFT onto GREELEY ST.  0.1 mi

          GREELEY ST becomes CONTINENTAL BLVD.  0.1 mi

          Turn RIGHT onto AMHERST RD.  0.3 mi

          Turn RIGHT onto TURKEY HILL RD.  2.0 mi

          Stay STRAIGHT to go onto MCQUESTION RD.  1.0 mi

          MCQUESTION RD becomes BABOOSIC LAKE RD.  0.6 mi

          Turn RIGHT onto BEAN RD.  0.4 mi

          Stay STRAIGHT to go onto WOODWARD RD.  1.5 mi

          Turn LEFT onto PARKHURST RD.  0.3 mi

          End at 58 Parkhurst Rd Merrimack

           

           

           

          See as many of you as can make it, starting around 9:00 AM.

           

           

           

           

           

          Completed since last weekend:

           

          (4 Dutton Street, Manchester) Built railings for stairs off front door decks. Installed stairs at side exit. Helped with inside work.

           

           

           

          Upcoming events:

           

          7-1/2 Ridge Street zoning variance hearing 10/14/2008

          Building permit, 7-1/2 Ridge Street

          Connect temporary power (7-1/2 Ridge Street, Nashua)

          Other small projects being coordinated

           

           

          eric

          Cell: 620-4182

        Your message has been successfully submitted and would be delivered to recipients shortly.