Re: [XP] Metrics to Prove XP Works

Expand Messages
  • Michael A. Johnson
    ... KLOC s just aren t a meaningful measurement. I liken it to building the heaviest airplane. If after I have refactored my code and I have fewer klocs of
    Message 1 of 20 , Dec 1, 2000
    • 0 Attachment
      > deflate if prolonged refactoring has occured) depending on the type
      > of LOC counter used. After all, I could utilize the CFCO development
      > methodology (Code First, Code Often) and produce phenomonal metrics
      > which would "compellingly demonstrate" that CFCO is far superior to
      > all other methodologies based on KAELOC/Staff-month. Of course, all
      > CFCO would do is likely generate a mess of code that is inefficient
      > and unmaintainable. Has anyone had to work on establishing some


      KLOC's just aren't a meaningful measurement. I liken it to building the
      heaviest airplane. If after I have refactored my code and I have fewer klocs
      of code that are more efficient, have I been less productive?

      Some things I would be more interested in:

      The number of requirements, er uh, stories were delivered and accepted by
      the customer per iteration.

      How close does work preformed match to work projected?

      What's the regressive error rate? i.e. the number of defects found in work
      done in a previous iterations that are discovered in the current iteration?

      How does the defect find rate curve look? flat? monotonically decreasing?
      heading for the moon?
    • Malte Kroeger
      KLOC is junk as everybody knows. The biggest problem you will probably have with metrics is, that there are usually no good metrics for old projects to compare
      Message 2 of 20 , Dec 2, 2000
      • 0 Attachment
        KLOC is junk as everybody knows.

        The biggest problem you will probably have with metrics is, that there are
        usually no good metrics for old projects to compare agains.
        And comparisons like User Storys per month compared to Heavy Weight Use
        Cases from a RUP-Process per month won't be very helpfull ether.

        I guess the only metrics that makes sense to apply is soft measures like
        customer satisfaction, visible speed compared to similar projects.
        Manageability and resposiveness.

        If you can do a pet project, maybe you can come up with changing
        requirements during the project and see how the team reacts etc.

        Malte
      • kjray
        [...] ... I think the best metrics for comparative success (from the business stand-point) are: - features actually implemented vs features planned - time from
        Message 3 of 20 , Dec 2, 2000
        • 0 Attachment
          [...]
          >> We are planning on piloting some XP projects at work, but we
          >> continually run across a question that we can't seem to answer
          >> effectively: "How will you quantitatively show that XP is an
          >> improvement over more traditional methodologies (iterative
          >> waterfall)?"[...]

          I think the best metrics for comparative success (from the business
          stand-point) are:

          - features actually implemented vs features planned
          - time from inception to release
          - number of bugs found after release
          - amount of code that has to be changed to fix
          bugs / amount of time required to fix bugs
          - amount of time / amount of code that has to be changed to
          add a new feature after release
          - man-power used

          You could also measure % of code lines tested with
          unit-tests/acceptance-tests.
        • Lowell Lindstrom
          ... How are you measuring your process today, both post-mortem and in process? I would start be looking at those existing metrics, verifying that they are
          Message 4 of 20 , Dec 4, 2000
          • 0 Attachment
            > From: kcdeberg@... [mailto:kcdeberg@...]
            > "How will you quantitatively show that XP is an
            > improvement over more traditional methodologies (iterative
            > waterfall)?"


            How are you measuring your process today, both post-mortem and in process?
            I would start be looking at those existing metrics, verifying that they are
            aligned to your teams/organizations goals. If they are, then XP should
            yield an improvement in those metrics. If not, then the use of XP may be
            questionable.

            If you do not have some history of metrics, then you'll need to establish
            some. But this is no reason to delay using practices from XP. The short
            iterations of XP give you more data points from the process than other
            methods. This accelerates analysis and therefore corrective action. In my
            experience, teams tend to over analyze and over complicate the metrics and
            never end up measuring. So, keep it simple.

            Like any other process, you must track the metrics, not just define them.
            Have a tracker, post the results, use them to improve.

            Lowell


            ==============================================
            Lowell Lindstrom
            lindstrom@...
            Object Mentor, Inc.
            Services to help software developers and their
            customers deliver better software, faster.
            People, Principles, Patterns, Process
            XP | OO | C++ | Java | Patterns
            www.objectmentor.com | www.xprogramming.com
            ==============================================
          • kcdeberg@excite.com
            All, Thanks for the responses. Based on the replies so far, he are my responses. 1). I agree LOC/time is not good. First, it is a poor in-process metric
            Message 5 of 20 , Dec 4, 2000
            • 0 Attachment
              All,

              Thanks for the responses. Based on the replies so far, he are my
              responses.

              1). I agree LOC/time is not good. First, it is a poor in-process
              metric because LOC-weighted curves between XP and a "normal" process
              are very different. XP likely forms some sort of a bell curve, or at
              least a "bumpy" curve. Code is produced much earlier, showing a
              rapid rise in productivity, then it will peak, then will appear to
              drop as refactoring takes the mess of code and molds it into a
              design. A literal read of that metric would clearly show a program
              should never leave its early phases of development because that is
              where all the production occurs. That is obviously intuitively
              wrong. A "normal" process would have a parabolic curve. No code is
              produced for the longest time, and then near the end it shoots up to
              its eventual level. Apples and oranges.

              2). No pet projects. Can't be done (commercial environment). Even
              if it could be done, it would be very tough to show XP was the factor
              that changed things. So many other factors exist in a project. It
              would require clones of the developers to be made, and subjected to
              the exact same environment. Maybe, unethically, in the future as
              cloning technology improves, clones could be made and parallel,
              identical projects could be run. Let's rule this out.

              3). The question was asked "Why pilot XP?" The reason falls under
              continuous improvement. New ways want to be tried and evaluated and
              then those improved methodologies used where they would give the best
              results. That's the motivation. The hard part is doing the
              "experiment" and then being able to conclusively give the results.
              We're trying to avoid the Florida "intention" results. If we have to
              hold our results up to the light, flex the results, shake the results
              and then make guesses as to what the real intention of the results
              are, then we're really not learning anything.

              4). Quantitative analysis can be used in this case. We're not
              looking at XP as a "silver bullet" methodology. The premise of XP
              with communication and simplicity intuitively says it could work with
              small projects, and probably would not work with large. While trying
              to determine, "Did XP work?" we're also then trying to characterize
              the type of project it worked and failed on. Then, in the future, we
              can say, "We have a small project, anticipate about 5 developers, who
              need to hit the market place fast. We're not sure of the details of
              the project yet, so requirement details will fluctuate wildly. What
              process do we use to develop?" we want to be able to look at the
              available methodologies and go, "XP looks like the one to use for
              this one because of [...]"

              5). "Customer satisfaction" doesn't work well. First, it takes until
              the very end to get any results whatsoever. Second, we're still
              stuck with the fact that we don't know if it was XP that got us to
              finish on-time or underbudget. Perhaps we would have done that well
              with a traditional process. Ultimately, the customer wants whatever
              product it is fast, cheap, and of quality relative to the price.
              Generally, a customer won't care how we got to the finished product.
              Maybe a "satisfaction" rating could come from feeling like they are
              part of the process, but that is only one part of XP, and not XP as a
              process. You could include the customer to make them happy in a
              traditional development, too.

              6). With respect to the manuals and tests question: It's generally
              accepted that testing improves quality. Taken to an extreme, no
              testing is viewed as bad. Therefore, a lot of testing must be good.
              Grossly stated, that's generally accepted as a practice, and would
              not require metrics. More user manuals to please a customer would be
              easy to measure as a metric using the customer satisfaction. A
              manual is very visible and a lot of interest would be placed on
              supplying the right manuals to the customer and that would be
              measured. The overall question really is ""How will you
              quantitatively show that XP is an improvement over more traditional
              methodologies (iterative waterfall)?"

              I've seen a couple of suggestions in the posts that might prove
              useful. One had to do with planning. Clearly, if we can show that
              estimating was better with XP than the traditional, that would score
              favorably. It would be fairly easy to track plan and actuals for
              that. Another measure might be tracking number of requirements
              changes, and comparing that to the project meeting milestones. This
              could show that XP is more responsive. A third measure suggested
              could be measuring number of stories created to fix errors from
              earlier increments as compared to total stories. This could compare
              to defect containment in a traditional project, but I'm not sure how.

              There probably needs to be some sort of conversion factor so we can
              compare apples to apples, but off the top of my head, I don't know
              what it could be.

              Keep the ideas coming. This could really help out in selling XP to
              management levels. If you can go to a boss and say, "I want to do XP
              because I think it would be more efficient," and the boss says why,
              and you can point to specific reasons, and then back it up with how
              you plan to demonstrate when it is over, the boss would be more
              likely to agree. After all, the boss wants cheaper and faster, too.
              If he can be convinced the experiment is worthwhile, and can show
              results afterward, he would more likely be interested in pursuing it
              than just saying, "It looks good, it feels good, it smells good,
              therefore it should be good."
            • Tom Mostyn
              ... Yes and no. Too much emphasis on KLOC is definitely a bad thing. However, KLOC can be a viable measure of productivity when comparing iterations of the
              Message 6 of 20 , Dec 5, 2000
              • 0 Attachment
                Keith Paton wrote:
                >
                > We are never going to get anywhere with "metrics" until we find a better way
                > of measuring value than counting lines of code.

                Yes and no. Too much emphasis on KLOC is definitely a bad thing.
                However, KLOC can be a viable measure of productivity when comparing
                iterations of the same project, but there are other important things to
                measure as well: various defect measurements, effort and schedule (late,
                early, on-time), etc. However, if one sets clear goals for taking
                measurements and then starts taking them, a nice side-effect is that
                what you are measuring tends to get optimized. Checkout Chapter 26 of
                Rapid Development by Steve McConnell.

                >
                > Keith
                >
                > ----- Original Message -----
                > From: <kcdeberg@...>
                > To: <extremeprogramming@egroups.com>
                > Sent: Friday, December 01, 2000 7:13 PM
                > Subject: [XP] Metrics to Prove XP Works
                >
                > > We are planning on piloting some XP projects at work, but we
                > > continually run across a question that we can't seem to answer
                > > effectively: "How will you quantitatively show that XP is an
                > > improvement over more traditional methodologies (iterative
                > > waterfall)?" We are wondering about this both post-mortem as well as
                > > in-process. One thought is to use a productivity metric such as
                > > KAELOC/Staff-month, but as we know, development methodology is only
                > > one of many factors that work into a productivity metric such as this
                > > one (others being developer experience, skill level, project
                > > resources, development environment, etc, etc). Also, since with XP,
                > > the documentation basically resides in the code with easy-to-read
                > > refactored code, this could help to inflate those metrics (or
                > > deflate if prolonged refactoring has occured) depending on the type
                > > of LOC counter used. After all, I could utilize the CFCO development
                > > methodology (Code First, Code Often) and produce phenomonal metrics
                > > which would "compellingly demonstrate" that CFCO is far superior to
                > > all other methodologies based on KAELOC/Staff-month. Of course, all
                > > CFCO would do is likely generate a mess of code that is inefficient
                > > and unmaintainable. Has anyone had to work on establishing some
                > > measurements that would help to reflect an increase (or decrease) in
                > > productivity when using an XP methodology? How could this be done so
                > > that any productivity changes could be reasonably attributed to the
                > > choice of development methodology, and not to the many other factors
                > > that effect productivity?
                > >
                > > Bill
                > >
                > >
                > >
                > > To Post a message, send it to: extremeprogramming@...
                > >
                > > To Unsubscribe, send a blank message to:
                > extremeprogramming-unsubscribe@...
                > >
                > > Ad-free courtesy of objectmentor.com
                > >
                > >
                >
                > To Post a message, send it to: extremeprogramming@...
                >
                > To Unsubscribe, send a blank message to: extremeprogramming-unsubscribe@...
                >
                > Ad-free courtesy of objectmentor.com

                --
                __________________________________________
                Tom Mostyn - Nortel Networks
                GSM Surveillance Development
                P.O. Box 833871 (Mail Stop 992 / 03 / B20 )
                Richardson, Texas 75083-3871
                Ph# 972-684-2083 (ESN 444-2083)
                mailto:tmostyn@...
              • kjray
                ... Measure lines of code as a form of progress , and you discourage refactoring, where the number of lines of code often goes down. You also discourage
                Message 7 of 20 , Dec 6, 2000
                • 0 Attachment
                  Tom Mostyn <tmostyn@...> on 12/5/00 7:25 PM wrote:

                  >Keith Paton wrote:
                  >>
                  >> We are never going to get anywhere with "metrics" until we find a better way
                  >> of measuring value than counting lines of code.
                  >
                  >Yes and no. Too much emphasis on KLOC is definitely a bad thing.
                  >However, KLOC can be a viable measure of productivity when comparing
                  >iterations of the same project, [...]

                  Measure lines of code as a form of 'progress', and you discourage
                  refactoring, where the number of lines of code often goes down. You also
                  discourage re-use (internal re-use as well as buying commercial
                  libraries). It may also encourage unnecessary comments.
                • Tom Mostyn
                  ... If you have those kind of people, the kind that are willing to sacrifice quality, readability and conciseness of code, putting themselves before the team,
                  Message 8 of 20 , Dec 6, 2000
                  • 0 Attachment
                    kjray wrote:
                    >
                    > Tom Mostyn <tmostyn@...> on 12/5/00 7:25 PM wrote:
                    >
                    > >Keith Paton wrote:
                    > >>
                    > >> We are never going to get anywhere with "metrics" until we find a better way
                    > >> of measuring value than counting lines of code.
                    > >
                    > >Yes and no. Too much emphasis on KLOC is definitely a bad thing.
                    > >However, KLOC can be a viable measure of productivity when comparing
                    > >iterations of the same project, [...]
                    >
                    > Measure lines of code as a form of 'progress', and you discourage
                    > refactoring, where the number of lines of code often goes down. You also
                    > discourage re-use (internal re-use as well as buying commercial
                    > libraries). It may also encourage unnecessary comments.

                    If you have those kind of people, the kind that are willing to sacrifice
                    quality, readability and conciseness of code, putting themselves before
                    the team, then no process/methodology/measurements can help you.

                    Also, total LOC is not the only measurement you can make. You can also
                    take changed LOC into account as well.

                    --
                    __________________________________________
                    Tom Mostyn - Nortel Networks
                    GSM Surveillance Development
                    P.O. Box 833871 (Mail Stop 992 / 03 / B20 )
                    Richardson, Texas 75083-3871
                    Ph# 972-684-2083 (ESN 444-2083)
                    mailto:tmostyn@...
                  • kjray
                    Tom Mostyn on 12/6/00 9:19 AM wrote: [...] ... [...] I m sick of people saying these things. People are usually trying to satisfy
                    Message 9 of 20 , Dec 6, 2000
                    • 0 Attachment
                      Tom Mostyn <tmostyn@...> on 12/6/00 9:19 AM wrote:

                      [...]
                      >If you have those kind of people
                      [...]

                      I'm sick of people saying these things.

                      People are usually trying to satisfy the goals that are presented to
                      them. (Weinbergs law: most people are trying to be helpful.) If they are
                      asked to increase lines of code, because that is measured, and
                      refactoring is NOT measured in a positive way, then they will do the
                      logical thing, which is to increase lines of code.

                      The same kind of goal-focus has been demonstrated experimentally when
                      groups of programmers were asked to write code with various goals: speed,
                      clarity, robustness, and so on.

                      XP's 12 practices are there to achieve _balance_. "Lines of code" is not
                      one of XP's goals... Writing tests for a task/story and making them pass
                      _is_ one of those goals. That's why trackers are supposed to ask how many
                      tasks have been done this iteration, how many are to left be done, etc.
                      If trackers start asking "how many lines of code did you write today?"
                      Guess what the logical person's focus is going to switch to?
                    • Glen Alleman
                      ... better way ... things to ... (late, ... of ... We use a tool Krakatau to produce lots of metrics for each build. One of the obvious ones is LOC and
                      Message 10 of 20 , Dec 6, 2000
                      • 0 Attachment
                        --- In extremeprogramming@egroups.com, "Tom Mostyn" <tmostyn@N...>
                        wrote:
                        > Keith Paton wrote:
                        > >
                        > > We are never going to get anywhere with "metrics" until we find a
                        better way
                        > > of measuring value than counting lines of code.
                        >
                        > Yes and no. Too much emphasis on KLOC is definitely a bad thing.
                        > However, KLOC can be a viable measure of productivity when comparing
                        > iterations of the same project, but there are other important
                        things to
                        > measure as well: various defect measurements, effort and schedule
                        (late,
                        > early, on-time), etc. However, if one sets clear goals for taking
                        > measurements and then starts taking them, a nice side-effect is that
                        > what you are measuring tends to get optimized. Checkout Chapter 26
                        of
                        > Rapid Development by Steve McConnell.
                        >
                        We use a tool Krakatau to produce lots of metrics for each build. One
                        of the "obvious" ones is LOC and Source LOC. These are not very
                        interesting in their own, but show a trend on how the system
                        complexity grows (along with class and method counts). It is also an
                        indication of system stabilization. With neatly 378K source lines of
                        Java now, the system is no longer a "simple" development project.
                        This "report" is plotted along with "defects found/fixed" and some
                        other obvious SQA metrics. This is posted on a wall where every walks
                        by on the way to the lunch room. With a large system integration
                        project (several mainframes and a doze or so Sun clusters are
                        an "external" integration problem, and the first customer on another
                        continent, this is one way to "keep" the integration staff focused.

                        Glen Alleman
                        www.niwotridge.com
                      • Robert Crawford
                        ... Because we re not producing code; we re producing business value. That s done by completing stories and making releases, not by the number of lines of code
                        Message 11 of 20 , Dec 6, 2000
                        • 0 Attachment
                          On Wed, Dec 06, 2000 at 01:38:51PM -0600, Tom Mostyn wrote:
                          > I find it odd that some XP'ers say "only the code knows" and "the code
                          > is the design" making XP a very code centric process, but then refuse to
                          > measure productivity in terms of code.

                          Because we're not producing code; we're producing business
                          value. That's done by completing stories and making releases, not
                          by the number of lines of code added/changed/deleted.

                          --
                          crawford@...
                        • Glen Alleman
                          ... [snip] ... also ... The LOC measure is a metric not a management policy. Any development manager that makes decisions on how much code is written
                          Message 12 of 20 , Dec 6, 2000
                          • 0 Attachment
                            --- In extremeprogramming@egroups.com, kjray <kjray@i...> wrote:
                            [snip]
                            >
                            > Measure lines of code as a form of 'progress', and you discourage
                            > refactoring, where the number of lines of code often goes down. You
                            also
                            > discourage re-use (internal re-use as well as buying commercial
                            > libraries). It may also encourage unnecessary comments.

                            The LOC measure is a metric not a management policy. Any development
                            manager that makes decisions on "how much code" is written wouldn't
                            last a week in our org. All metrics provide "trend" information they
                            are not point measures (to be annoyingly statistical about it). The
                            tools we use provide "data" not information, with trending data we
                            can see where we've been not where we're going.
                            This argument of LOC is like the argument of BDUF, it comes from a
                            lack of understanding of how to use tools to manage projects. If a
                            manager took a metrics tools and applied to our project without
                            knowing the context of the past and the underlying complexity issues,
                            then he (or she) would get garbage from the numbers.
                            The same for the BDUF argument. Not valid product development does
                            BDUF, it's all iterative maybe not XP's definition of iterative, but
                            iterative none the less.
                            Metrics are a fundamental part of good management, from measuring the
                            gardeners progress on cutting the lawn to number of LOC or Classes,
                            or defects per method per class, what ever. LOC "may" not be the
                            best, but it is a foundation number. It is used on our project as
                            a "redaction" measurement. We want the LOC to go down for specific
                            domains – after they have stabilized.

                            Glen Alleman
                            www.niwotridge.com
                          • Tom Mostyn
                            ... Then why do you say them yourself? To me your comments implied that some people would sacrifice quality, readability and conciseness of code in favor of
                            Message 13 of 20 , Dec 6, 2000
                            • 0 Attachment
                              kjray wrote:
                              >
                              > Tom Mostyn <tmostyn@...> on 12/6/00 9:19 AM wrote:
                              >
                              > [...]
                              > >If you have those kind of people
                              > [...]
                              >
                              > I'm sick of people saying these things.

                              Then why do you say them yourself? To me your comments implied that
                              some people would sacrifice quality, readability and conciseness of code
                              in favor of producing unnecessary code to fulfill a single measurment.
                              IMO, these people are either bad or ignorant. The latter can be fixed
                              and the former needs to be removed.

                              > People are usually trying to satisfy the goals that are presented to
                              > them. (Weinbergs law: most people are trying to be helpful.) If they are
                              > asked to increase lines of code, because that is measured, and
                              > refactoring is NOT measured in a positive way, then they will do the
                              > logical thing, which is to increase lines of code.

                              If total LOC were the only measure then I agree that that would be bad.

                              > The same kind of goal-focus has been demonstrated experimentally when
                              > groups of programmers were asked to write code with various goals: speed,
                              > clarity, robustness, and so on.

                              >
                              > XP's 12 practices are there to achieve _balance_. "Lines of code" is not
                              > one of XP's goals... Writing tests for a task/story and making them pass
                              > _is_ one of those goals. That's why trackers are supposed to ask how many
                              > tasks have been done this iteration, how many are to left be done, etc.
                              > If trackers start asking "how many lines of code did you write today?"
                              > Guess what the logical person's focus is going to switch to?

                              I find it odd that some XP'ers say "only the code knows" and "the code
                              is the design" making XP a very code centric process, but then refuse to
                              measure productivity in terms of code. Perhaps the main misperception
                              is that the more LOC the better. This clearly is not true. For
                              example: In iteration N there were a total of M KLOC in the system
                              accomplishing X tasks. In iteraton N+1 there were a total of M+O KLOC in
                              the system accomplishing X+Y tasks. If O is small, but X+Y is close to
                              2X then it looks pretty good because reuse appears to be high. An
                              indication of good design, IMO. If O is close to M then M+O is close to
                              2M. This might indicate a problem if the Y tasks in iteration N+1 were
                              closely related or similar to X tasks in iteration N. However, Y tasks
                              maybe totally unrelated to X tasks so O close to or even greater than M
                              is probably justified.

                              --
                              __________________________________________
                              Tom Mostyn - Nortel Networks
                              GSM Surveillance Development
                            • Tom Mostyn
                              ... XP produces business value by generating code. One is easier to measure than the other. Given the choice of measuring business value vs. code I would
                              Message 14 of 20 , Dec 6, 2000
                              • 0 Attachment
                                Robert Crawford wrote:
                                >
                                > On Wed, Dec 06, 2000 at 01:38:51PM -0600, Tom Mostyn wrote:
                                > > I find it odd that some XP'ers say "only the code knows" and "the code
                                > > is the design" making XP a very code centric process, but then refuse to
                                > > measure productivity in terms of code.
                                >
                                > Because we're not producing code; we're producing business
                                > value. That's done by completing stories and making releases, not
                                > by the number of lines of code added/changed/deleted.

                                XP produces business value by generating code. One is easier to measure
                                than the other. Given the choice of measuring business value vs. code I
                                would choose to measure code. It's easier to measure, IMO.

                                --
                                __________________________________________
                                Tom Mostyn - Nortel Networks
                                GSM Surveillance Development
                              • Robert Crawford
                                ... We re already measuring business value, though. Every story has business value; completing a story bumps up the business value metric . This could be
                                Message 15 of 20 , Dec 6, 2000
                                • 0 Attachment
                                  On Wed, Dec 06, 2000 at 01:59:55PM -0600, Tom Mostyn wrote:
                                  > Robert Crawford wrote:
                                  > > On Wed, Dec 06, 2000 at 01:38:51PM -0600, Tom Mostyn wrote:
                                  > > > I find it odd that some XP'ers say "only the code knows" and "the code
                                  > > > is the design" making XP a very code centric process, but then refuse to
                                  > > > measure productivity in terms of code.
                                  > > Because we're not producing code; we're producing business
                                  > > value. That's done by completing stories and making releases, not
                                  > > by the number of lines of code added/changed/deleted.
                                  > XP produces business value by generating code. One is easier to measure
                                  > than the other. Given the choice of measuring business value vs. code I
                                  > would choose to measure code. It's easier to measure, IMO.

                                  We're already measuring business value, though. Every story
                                  has business value; completing a story bumps up the "business value
                                  metric".

                                  This could be expressed as a graph of say, "Total Stories" and
                                  "Stories Completed" over time. Total stories gives you the potential
                                  business value of the project; completed stories gives you the present
                                  business value. The slope of the "Stories Completed" value gives you a
                                  very rough velocity (rough because stories have different costs).

                                  Lines of code doesn't mean much to a client -- they want a
                                  system that provides value, not one that had $BIGNUM lines of code
                                  changed last iteration.

                                  --
                                  crawford@...
                                • Tom Mostyn
                                  ... Business value can change like the wind. At one point in time C3 had enough business value to proceed and continue with the project for years. Then one
                                  Message 16 of 20 , Dec 6, 2000
                                  • 0 Attachment
                                    Robert Crawford wrote:

                                    > We're already measuring business value, though. Every story
                                    > has business value; completing a story bumps up the "business value
                                    > metric".
                                    >
                                    > This could be expressed as a graph of say, "Total Stories" and
                                    > "Stories Completed" over time. Total stories gives you the potential
                                    > business value of the project; completed stories gives you the present
                                    > business value. The slope of the "Stories Completed" value gives you a
                                    > very rough velocity (rough because stories have different costs).

                                    Business value can change like the wind. At one point in time C3 had
                                    enough business value to proceed and continue with the project for
                                    years. Then one executive decision terminated the project. Clearly,
                                    somewhere, the business value declined.

                                    > Lines of code doesn't mean much to a client -- they want a
                                    > system that provides value, not one that had $BIGNUM lines of code
                                    > changed last iteration.

                                    Agreed, LOC don't mean much to a client and I never suggested that they
                                    be presented to a client. Metrics and measurement are simply a way to
                                    figure out where you are and indicate how you might improve.

                                    <gripe on>
                                    I have repeated over and over again that LOC in and of itself is not
                                    necessarily a good measure of anything. It's usefulness depends on your
                                    goals and its context with other measurements/metrics. Yet everyone
                                    seems to be focusing on one thing, LOC.
                                    </gripe off>

                                    --
                                    __________________________________________
                                    Tom Mostyn - Nortel Networks
                                  • Dossy
                                    ... Actually, I ve wondered about this before. I think if you think about the actual meaning, business value never changes. What changes wildly is business
                                    Message 17 of 20 , Dec 6, 2000
                                    • 0 Attachment
                                      On 2000.12.06, Tom Mostyn <tmostyn@...> wrote:
                                      >
                                      > Business value can change like the wind. At one point in time C3 had
                                      ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
                                      > enough business value to proceed and continue with the project for
                                      > years. Then one executive decision terminated the project. Clearly,
                                      > somewhere, the business value declined.

                                      Actually, I've wondered about this before. I think if you think
                                      about the actual meaning, business value never changes. What
                                      changes wildly is business itself.

                                      Business may change enough to make the currently implemented stories
                                      irrelevant. They still have business value, just not to your business
                                      anymore.


                                      --
                                      Dossy Shiobara mail: dossy@...
                                      Panoptic Computer Network web: http://www.panoptic.com/
                                    • Ian Hobson
                                      In article , Tom Mostyn writes ... If you want business value, measure business value. (or
                                      Message 18 of 20 , Dec 11, 2000
                                      • 0 Attachment
                                        In article <3A2E9ABB.1216D94A@...>, Tom Mostyn
                                        <tmostyn@...> writes
                                        >Robert Crawford wrote:
                                        >>
                                        >> On Wed, Dec 06, 2000 at 01:38:51PM -0600, Tom Mostyn wrote:
                                        >> > I find it odd that some XP'ers say "only the code knows" and "the code
                                        >> > is the design" making XP a very code centric process, but then refuse to
                                        >> > measure productivity in terms of code.
                                        >>
                                        >> Because we're not producing code; we're producing business
                                        >> value. That's done by completing stories and making releases, not
                                        >> by the number of lines of code added/changed/deleted.
                                        >
                                        >XP produces business value by generating code. One is easier to measure
                                        >than the other. Given the choice of measuring business value vs. code I
                                        >would choose to measure code. It's easier to measure, IMO.
                                        >
                                        If you want business value, measure business value. (or some close
                                        analog)

                                        If you want code, measure code.

                                        Remember is was a *drunk* who dropped his keys in the dark but was
                                        looking under the lamp-post because he could see there!

                                        Regards

                                        Ian Hobson

                                        Every time we teach a child something, we prevent him from inventing
                                        it himself. - Jean Piaget