Loading ...
Sorry, an error occurred while loading the content.

12589Re: [engineeringcivil] Quality control Procedure for Approved Precast Elements After delivery on site

Expand Messages
  • Malik Fairose
    Jan 25, 2014
    • 0 Attachment
      walaikum salam



      On Saturday, January 25, 2014 10:08 AM, "amir_khaliq@..." <amir_khaliq@...> wrote:
       
      Assalm-o-Allaikum,
                                     
      friend i need your  kind advise for quality control procedure for
      precast circular,rectangle pipes and manholes and their accessories.
      for storm water and sanitary system.

      i need the quality control procedure and testing methods after
      the delivery on site from precast factory/supplier and also frequency
      of tests.
      kindly give me your advises and related documents.for above  materials.

      AMiR KHALIQ

      MATERIAL ENGINEER

      KHATIB AND ALAMI

      SAUDI ARABIA



    • Show all 2 messages in this topic