Loading ...
Sorry, an error occurred while loading the content.

5904Re: AT&T Glen Allen, VA

Expand Messages
  • ozob99
    Jun 1, 2003
    • 0 Attachment
      --- In coldwarcomms@yahoogroups.com, David Lesher <wb8foz@n...> wrote:
      > Speaking on Deep Background, the Press Secretary whispered:
      > >
      > >
      > > Glen Allen was built because a tall bldg(Central National Bank i
      > > think) partially blocked the TD-2 path so a dog leg was needed to
      > > solve this;there were a number of cases like this requiring an
      extra
      > > station.
      >
      > Errr..
      >
      > ISTR the stations went
      FreqA<---->FreqA[]FreqB<---->FreqB[]FreqA<----
      >
      > So what happened when they added one inbetween?

      This was a marginally blocked path & the path loss/fade margin for the
      fully loaded TD-2 route was more likely to go noisy than the low
      capacity TL/TM;TL/TM routes in VA were usually revertive switching to
      the band least likely to fade.

      >
      >
      > --
      > A host is a host from coast to coast.................wb8foz@n...
      > & no one will talk to a host that's close........[v].(301) 56-LINUX
      > Unless the host (that isn't close).........................pob 1433
      > is busy, hung or dead....................................20915-1433
    • Show all 5 messages in this topic