FW: [ClevelandRails] Elyria Station News

I have been having trouble posting to any Yahoo group for several weeks. Today, I logged into Yahoo and completed the email verification and was then able to
Mark Nilges
11:59 AM
#27526
This message has attachments
  • PNG
    312 KB
27525

Re: Elyria Station News

Mark, Totally understand that ADA needs are to be met, and that they should be.  There are just ways to do things way more cost effective than what is
Thomas Seiler
Jan 19
#27525
 
27524

Re: Elyria Station News

No matter by what method, people have to get trainside to board. The options are tunnel with elevator, overhead with elevator or gated system across the tracks
William J Powers
Jan 19
#27524
 
27523

Re: Elyria Station News

Tom, part of the problem lies in the fact that Norfolk Southern did not allow the use of the existing tunnels to access the platforms, thereby requiring the
mjarail
Jan 19
#27523
 
27522

Re: Elyria Station News

I think you both make points that do not really contradict each other, but shows how we have so "screwed" ourselves in this country.   So many, if not most
Thomas Seiler
Jan 19
#27522
 
27521

Re: Elyria Station News

Unsigned sir,     The article I read at this site led me to believe the money was being spent on a pedestrian overpass and elevator. If the project is far
William J Powers
Jan 18
#27521
 
27520

Re: Elyria Station News

Mr. Powers, With all due respect, the work to be done in Elyria is not, as you put it, "a waste of money." The existing station is so bad, a railway in a Third
mjarail
Jan 18
#27520
 
27519

Re: Elyria Station News

Not a problem. The platform would be at 8" above top of rail. Superliner equipment has on board ramps. The conventional single level cars would use a
mjarail
Jan 18
#27519
 
27518

Re: Elyria Station News

NS blocked use of the existing tunnels. Thus inflating the costs of this project. And ADA requirements specify platforms at proper height. Since the station
elmeroscar
Jan 18
#27518
 
27517

Re: Elyria Station News

Mark & Tom,There were and still are two tunnels under the tracks.  One for passengers and one for baggage and freight.  I was last in the passenger one about
Lee Sheffield
Jan 18
#27517
 
27516

Re: Elyria Station News

Wow, this looks like a huge waste of money for what it will provide. Caltrans has fences with crossing gates (people scaled) which handle thousands per day. At
William J Powers
Jan 18
#27516
 
27515

Re: Elyria Station News

Tom and all, The article clearly states that an overhead walkway is to be built, with elevators to the platforms and waiting room. Everything is to be in
mjarail
Jan 18
#27515
 
27514

Re: Elyria Station News

It is completely correct that their were tunnels underneath to access the platforms.á But if I recall correctly, the use of those tunnels (they are or were in
Thomas Seiler
Jan 18
#27514
 
27513

Re: Elyria Station News

Could the picture from the article help answer? Looks like there would have to be at least one tunnel.
Mark Stotzer
Jan 17
#27513
 
27512

Re: Elyria Station News

Just curious, but wasn’t there a tunnel under the track overhead for access to the platforms? Tom ... Tom Swisher wa8pyr.list@... "Democracy is two
Tom Swisher
Jan 17
#27512
 