    I think it has to do with our basic optimism. Boats that are 1/2 way done are 90% completed (it looks 90% done). The final cost will be approximately twice our
    Message 1 of 4 , Sep 1, 2003
      I think it has to do with our basic optimism. Boats that are 1/2 way
      done are 90% completed (it looks 90% done). The final cost will be
      approximately twice our realistic analyses at the beginning of the
      project. Guess how much time it is going to take compared to the
      original estimate?? I am sure this group can find the appropriate name
      for this condition.

      Silverliningitus?

      HJ



      Bruce Hector wrote:

      >--- In bolger@yahoogroups.com, Harry James <welshman@p...> wrote: I
      >can see you acquired this project 90% completed.
      >
      >Why is it that these 90% completed projects seem to require another
      >90% of the labour to complete.
      >
      >Bruce Hector
      >Back from ripping up some rotted ply of of his "90%" complleted Micro
      >he bought this summer.
      >
      >
      >
      >