Loading ...
Sorry, an error occurred while loading the content.

69709Re: Need advice on Micro mast step

Expand Messages
  • MylesJ. Swift
    Jul 12, 2013
    • 0 Attachment

      Liam,

       

      I’d cut out the back section of the current top piece forming an open slot towards the back. Next, put another  piece of ply over that with the hole in the correct space. Extend the bottom bracing with something the right thickness so the new top piece lines up and is supported all around. The only change to the mast position then is being 5/8” or so higher and you can even take that out by beveling the new hole.

       

      Prairie dog,

      Micro’s mast sits in a free flooding well and the mast step is higher than the drains, so no worry on that point.

       

      MylesJ

    • Show all 10 messages in this topic