Re: [agile-usability] Linkedin Group on Agile and UX

Expand Messages
  • William Pietri
    ... Interesting. I m still a little unclear on what that person actually does. You mentioned previously that the project manager is responsible for delivery,
    Message 1 of 18 , Jan 5, 2010
    • 0 Attachment
      On 01/05/2010 06:20 PM, Tim Wright wrote:
      IT's a slightly different setup than that. The Agile PM has two teams that report to him (either through secondment from business or as their managers - we don't do the matrix resourcing anymore). One is the development team and the other is the business experts team. The business experts act more like a customer or product owner.
       
      The project is measured (and the PM rewarded) by how well the project meets several "success sliders" and removes roadblocks that hinder the team achieving those measures - as well as identifying external (to the project) things that might impact the team.

      Interesting. I'm still a little unclear on what that person actually does. You mentioned previously that the project manager is responsible for delivery, but in the fully Agile shops I'm familiar with, it's the team that is responsible.

      Just so I can understand their function better, what would happen if you didn't have the project manager? If you just had all of those people working as one team with common goals?

      William
    • Tim Wright
      To quote from http://www.bigvisible.com/gschlitz/passive-conduit/ (because Im tired after work :) I believe that one of the simplest and most effective things
      Message 2 of 18 , Jan 5, 2010
      • 0 Attachment
        To quote from http://www.bigvisible.com/gschlitz/passive-conduit/ (because Im tired after work :)

        "I believe that one of the simplest and most effective things an Agile project manager can do is, ironically, nothing!

        "Well, not really nothing. But none of the things mentioned above. The Agile PM should be a conduit of information, a “passive conduit” as Thomsett describes nicely in his excellent book. Instead of solving problems, focus on getting problems to the right people. For every challenge, risk and issue arises, spend your time communicating to those who need to know, those who are empowered and able to solve the challenge or issue, or who are affected by the risk."

        Tim

        On Wed, Jan 6, 2010 at 3:28 PM, William Pietri <william@...> wrote:
         

        On 01/05/2010 06:20 PM, Tim Wright wrote:
        IT's a slightly different setup than that. The Agile PM has two teams that report to him (either through secondment from business or as their managers - we don't do the matrix resourcing anymore). One is the development team and the other is the business experts team. The business experts act more like a customer or product owner.
         
        The project is measured (and the PM rewarded) by how well the project meets several "success sliders" and removes roadblocks that hinder the team achieving those measures - as well as identifying external (to the project) things that might impact the team.

        Interesting. I'm still a little unclear on what that person actually does. You mentioned previously that the project manager is responsible for delivery, but in the fully Agile shops I'm familiar with, it's the team that is responsible.

        Just so I can understand their function better, what would happen if you didn't have the project manager? If you just had all of those people working as one team with common goals?

        William

      • Glennette Clark
        Essentially, another name for a SCRUM master. Glennette ... -- Glennette Clark Lazy Smart Creative 202-683-9508 glennette@lazysmart.com UXCamp DC - Jan. 23,
        Message 3 of 18 , Jan 5, 2010
        • 0 Attachment
          Essentially, another name for a SCRUM master.

          Glennette

          On 1/5/10, Tim Wright <sambo.shacklock@...> wrote:
          > To quote from http://www.bigvisible.com/gschlitz/passive-conduit/ (because
          > Im tired after work :)
          >
          > "I believe that one of the simplest and most effective things an Agile
          > project manager can do is, ironically, nothing!
          >
          > "Well, not really *nothing*. But none of the things mentioned above. The
          > Agile PM should be a conduit of information, a “passive conduit” as Thomsett
          > describes nicely in his excellent book. Instead of solving problems, focus
          > on getting problems to the right people. For every challenge, risk and issue
          > arises, spend your time communicating to those who need to know, those who
          > are empowered and able to solve the challenge or issue, or who are affected
          > by the risk."
          >
          > Tim
          >
          > On Wed, Jan 6, 2010 at 3:28 PM, William Pietri <william@...> wrote:
          >
          >>
          >>
          >> On 01/05/2010 06:20 PM, Tim Wright wrote:
          >>
          >> IT's a slightly different setup than that. The Agile PM has two teams that
          >> report to him (either through secondment from business or as their
          >> managers
          >> - we don't do the matrix resourcing anymore). One is the development team
          >> and the other is the business experts team. The business experts act more
          >> like a customer or product owner.
          >>
          >> The project is measured (and the PM rewarded) by how well the project
          >> meets
          >> several "success sliders" and removes roadblocks that hinder the team
          >> achieving those measures - as well as identifying external (to the
          >> project)
          >> things that might impact the team.
          >>
          >>
          >> Interesting. I'm still a little unclear on what that person actually does.
          >> You mentioned previously that the project manager is responsible for
          >> delivery, but in the fully Agile shops I'm familiar with, it's the team
          >> that
          >> is responsible.
          >>
          >> Just so I can understand their function better, what would happen if you
          >> didn't have the project manager? If you just had all of those people
          >> working
          >> as one team with common goals?
          >>
          >> William
          >>
          >>
          >


          --
          Glennette Clark
          Lazy Smart Creative
          202-683-9508
          glennette@...

          UXCamp DC - Jan. 23, 2010 - http://uxbarcampdc.eventbrite.com
        • Marius van Dam
          They certainly do use LinkedIn: the group grew from 2 to 33 members in a few hours. My 2 cents on Agile Project Managers : I m a PM myself but essentially the
          Message 4 of 18 , Jan 6, 2010
          • 0 Attachment
            They certainly do use LinkedIn: the group grew from 2 to 33 members in a few hours.

            My 2 cents on 'Agile Project Managers':

            I'm a PM myself but essentially the PM model and the Agile model are different worlds. They are not necessarily incompatible though. A large project for a new online photo printing service could very well be managed using Prince2 (or similar) where different teams report to the project manager. The development of the supporting web app could be done using Scrum. While the set up of the photo printing facility is managed in a more traditional waterfall manner.

            Of course there is also another way by using the Scrum of Scrum, but I wonder if Scrum if fit for setting up a photo printing facility. 

            Anyhow in an Agile environment the traditional PM will have to adapt hence the term 'Agile Project Management/Manager'. (not sure if anyone has this on his business card though)

            Regards,

            Marius van Dam

            YouAreHere, weblog on UX+Agile - http://www.youarehere.nl

            2010/1/5 Jared Spool <jspool@...>
             


            On Jan 5, 2010, at 1:49 PM, William Pietri wrote:

            On 01/05/2010 05:21 AM, mariusvandam wrote:
            > [...] it's a subgroup of the 'Agile Project Managers' group. [...]
            > 

            This is a bit of a digression, but what does an Agile project manager do?

            Apparently, they use LinkedIn.

            Jared




            --
            Met vriendelijke groet,

            Marius van Dam
            ---
            mariusvandam@...
          • William Pietri
            Heh. I was going to say it sounds like what all agile team members should be doing, as well as any manager in an agile organization. I guess the actual
            Message 5 of 18 , Jan 6, 2010
            • 0 Attachment
              Heh. I was going to say it sounds like what all agile team members
              should be doing, as well as any manager in an agile organization.

              I guess the actual function of an agile project manager will have to
              remain a mystery to me for now, but my very tentative assumption is that
              it has something to do with bridging the gaps that appear in
              organizations that are more agile in some spots than others. Which is
              what you'd expect to find in larger or older organizations attempting
              transitions.

              Thanks for indulging the digression.

              William

              On 01/05/2010 08:56 PM, Glennette Clark wrote:
              > Essentially, another name for a SCRUM master.
              >
              > Glennette
              >
              > On 1/5/10, Tim Wright<sambo.shacklock@...> wrote:
              >
              >> To quote from http://www.bigvisible.com/gschlitz/passive-conduit/ (because
              >> Im tired after work :)
              >>
              >> "I believe that one of the simplest and most effective things an Agile
              >> project manager can do is, ironically, nothing!
              >>
              >> "Well, not really *nothing*. But none of the things mentioned above. The
              >> Agile PM should be a conduit of information, a “passive conduit” as Thomsett
              >> describes nicely in his excellent book. Instead of solving problems, focus
              >> on getting problems to the right people. For every challenge, risk and issue
              >> arises, spend your time communicating to those who need to know, those who
              >> are empowered and able to solve the challenge or issue, or who are affected
              >> by the risk."
              >>
              >> Tim
              >>
              >> On Wed, Jan 6, 2010 at 3:28 PM, William Pietri<william@...> wrote:
              >>
              >>
              >>>
              >>> On 01/05/2010 06:20 PM, Tim Wright wrote:
              >>>
              >>> IT's a slightly different setup than that. The Agile PM has two teams that
              >>> report to him (either through secondment from business or as their
              >>> managers
              >>> - we don't do the matrix resourcing anymore). One is the development team
              >>> and the other is the business experts team. The business experts act more
              >>> like a customer or product owner.
              >>>
              >>> The project is measured (and the PM rewarded) by how well the project
              >>> meets
              >>> several "success sliders" and removes roadblocks that hinder the team
              >>> achieving those measures - as well as identifying external (to the
              >>> project)
              >>> things that might impact the team.
              >>>
              >>>
              >>> Interesting. I'm still a little unclear on what that person actually does.
              >>> You mentioned previously that the project manager is responsible for
              >>> delivery, but in the fully Agile shops I'm familiar with, it's the team
              >>> that
              >>> is responsible.
              >>>
              >>> Just so I can understand their function better, what would happen if you
              >>> didn't have the project manager? If you just had all of those people
              >>> working
              >>> as one team with common goals?
              >>>
              >>> William
              >>>
              >>>
              >>>
              >>
              >
              >
            • Craig Davidson
              What do you call the SCRUM master when you are not doing SCRUM? ;-) 2010/1/6 Glennette Clark ... What do you call the SCRUM master when
              Message 6 of 18 , Jan 7, 2010
              • 0 Attachment
                What do you call the SCRUM master when you are not doing SCRUM? ;-)

                2010/1/6 Glennette Clark <glennette@...>
                Essentially, another name for a SCRUM master.

                Glennette

                On 1/5/10, Tim Wright <sambo.shacklock@...> wrote:
                > To quote from http://www.bigvisible.com/gschlitz/passive-conduit/ (because
                > Im tired after work :)
                >
                > "I believe that one of the simplest and most effective things an Agile
                > project manager can do is, ironically, nothing!
                >
                > "Well, not really *nothing*. But none of the things mentioned above. The
                > Agile PM should be a conduit of information, a “passive conduit” as Thomsett
                > describes nicely in his excellent book. Instead of solving problems, focus
                > on getting problems to the right people. For every challenge, risk and issue
                > arises, spend your time communicating to those who need to know, those who
                > are empowered and able to solve the challenge or issue, or who are affected
                > by the risk."
                >
                > Tim
                >
                > On Wed, Jan 6, 2010 at 3:28 PM, William Pietri <william@...> wrote:
                >
                >>
                >>
                >> On 01/05/2010 06:20 PM, Tim Wright wrote:
                >>
                >> IT's a slightly different setup than that. The Agile PM has two teams that
                >> report to him (either through secondment from business or as their
                >> managers
                >> - we don't do the matrix resourcing anymore). One is the development team
                >> and the other is the business experts team. The business experts act more
                >> like a customer or product owner.
                >>
                >> The project is measured (and the PM rewarded) by how well the project
                >> meets
                >> several "success sliders" and removes roadblocks that hinder the team
                >> achieving those measures - as well as identifying external (to the
                >> project)
                >> things that might impact the team.
                >>
                >>
                >> Interesting. I'm still a little unclear on what that person actually does.
                >> You mentioned previously that the project manager is responsible for
                >> delivery, but in the fully Agile shops I'm familiar with, it's the team
                >> that
                >> is responsible.
                >>
                >> Just so I can understand their function better, what would happen if you
                >> didn't have the project manager? If you just had all of those people
                >> working
                >> as one team with common goals?
                >>
                >> William
                >>
                >>
                >


                --
                Glennette Clark
                Lazy Smart Creative
                202-683-9508
                glennette@...

                UXCamp DC - Jan. 23, 2010 - http://uxbarcampdc.eventbrite.com


                ------------------------------------

                Yahoo! Groups Links

                <*> To visit your group on the web, go to:
                   http://groups.yahoo.com/group/agile-usability/

                <*> Your email settings:
                   Individual Email | Traditional

                <*> To change settings online go to:
                   http://groups.yahoo.com/group/agile-usability/join
                   (Yahoo! ID required)

                <*> To change settings via email:
                   agile-usability-digest@yahoogroups.com
                   agile-usability-fullfeatured@yahoogroups.com

                <*> To unsubscribe from this group, send an email to:
                   agile-usability-unsubscribe@yahoogroups.com

                <*> Your use of Yahoo! Groups is subject to:
                   http://docs.yahoo.com/info/terms/


              • Anders Ramsay
                What you call yourself is usually only important if you don t know what you re doing. If you know what you re doing and/or are upfront about not knowing, that
                Message 7 of 18 , Jan 7, 2010
                • 0 Attachment
                  What you call yourself is usually only important if you don't know what you're  doing. If you know what you're doing and/or are upfront about not knowing, that will speak louder than any titles you might give yourself. The people who are managing the project are the project managers, meaning someone else may very well have that title but isn't actually managing (or shepherding, facilitating, whatever) much of anything.  

                  Oh, and it's Scrum, not SCRUM (It's not an abbreviation.)

                  -Anders

                  Sent from my iPhone

                  On Jan 7, 2010, at 6:38 AM, Craig Davidson <craigmdavidson@...> wrote:

                   

                  What do you call the SCRUM master when you are not doing SCRUM? ;-)

                  2010/1/6 Glennette Clark <glennette@gmail. com>
                  Essentially, another name for a SCRUM master.

                  Glennette

                  On 1/5/10, Tim Wright <sambo.shacklock@gmail.com> wrote:
                  > To quote from http://www.bigvisib le.com/gschlitz/ passive-conduit/ (because
                  > Im tired after work :)
                  >
                  > "I believe that one of the simplest and most effective things an Agile
                  > project manager can do is, ironically, nothing!
                  >
                  > "Well, not really *nothing*. But none of the things mentioned above. The
                  > Agile PM should be a conduit of information, a “passive conduit” as Thomsett
                  > describes nicely in his excellent book. Instead of solving problems, focus
                  > on getting problems to the right people. For every challenge, risk and issue
                  > arises, spend your time communicating to those who need to know, those who
                  > are empowered and able to solve the challenge or issue, or who are affected
                  > by the risk."
                  >
                  > Tim
                  >
                  > On Wed, Jan 6, 2010 at 3:28 PM, William Pietri <william@scissor. com> wrote:
                  >
                  >>
                  >>
                  >> On 01/05/2010 06:20 PM, Tim Wright wrote:
                  >>
                  >> IT's a slightly different setup than that. The Agile PM has two teams that
                  >> report to him (either through secondment from business or as their
                  >> managers
                  >> - we don't do the matrix resourcing anymore). One is the development team
                  >> and the other is the business experts team. The business experts act more
                  >> like a customer or product owner.
                  >>
                  >> The project is measured (and the PM rewarded) by how well the project
                  >> meets
                  >> several "success sliders" and removes roadblocks that hinder the team
                  >> achieving those measures - as well as identifying external (to the
                  >> project)
                  >> things that might impact the team.
                  >>
                  >>
                  >> Interesting. I'm still a little unclear on what that person actually does.
                  >> You mentioned previously that the project manager is responsible for
                  >> delivery, but in the fully Agile shops I'm familiar with, it's the team
                  >> that
                  >> is responsible.
                  >>
                  >> Just so I can understand their function better, what would happen if you
                  >> didn't have the project manager? If you just had all of those people
                  >> working
                  >> as one team with common goals?
                  >>
                  >> William
                  >>
                  >>
                  >


                  --
                  Glennette Clark
                  Lazy Smart Creative
                  202-683-9508
                  glennette@lazysmart .com

                  UXCamp DC - Jan. 23, 2010 - http://uxbarcampdc. eventbrite. com


                  ------------ --------- --------- ------

                  Yahoo! Groups Links

                  <*> To visit your group on the web, go to:
                     http://groups.yahoo.com/ group/agile- usability/

                  <*> Your email settings:
                     Individual Email | Traditional

                  <*> To change settings online go to:
                     http://groups.yahoo.com/ group/agile- usability/ join
                     (Yahoo! ID required)

                  <*> To change settings via email:
                     agile-usability- digest@yahoogroups.com
                     agile-usability- fullfeatured@ yahoogroups. com

                  <*> To unsubscribe from this group, send an email to:
                     agile-usability- unsubscribe@ yahoogroups. com

                  <*> Your use of Yahoo! Groups is subject to:
                     http://docs.yahoo.com/ info/terms/


                • Glennette Clark
                  I suspect that you could call yourself an Agile project manager. I don t think that the duties, per se, are all that different it is just a matter of which
                  Message 8 of 18 , Jan 7, 2010
                  • 0 Attachment
                    I suspect that you could call yourself an Agile project manager. I don't think that the duties, per se, are all that different it is just a matter of which agile methodology you choose to follow. Because I was trained as a SCRUM Master, that is what I called myself. I had another colleague who was not specifically trained in SCRUM who just referred to herself as a project manager. 

                    In my opinion, it is a matter of semantics and agile methodology.

                    Glennette

                    On Thu, Jan 7, 2010 at 4:37 PM, Anders Ramsay <andersr@...> wrote:
                     

                    What you call yourself is usually only important if you don't know what you're  doing. If you know what you're doing and/or are upfront about not knowing, that will speak louder than any titles you might give yourself. The people who are managing the project are the project managers, meaning someone else may very well have that title but isn't actually managing (or shepherding, facilitating, whatever) much of anything.  

                    Oh, and it's Scrum, not SCRUM (It's not an abbreviation.)

                    -Anders

                    Sent from my iPhone

                    On Jan 7, 2010, at 6:38 AM, Craig Davidson <craigmdavidson@...> wrote:

                     

                    What do you call the SCRUM master when you are not doing SCRUM? ;-)

                    2010/1/6 Glennette Clark <glennette@...>
                    Essentially, another name for a SCRUM master.

                    Glennette

                    On 1/5/10, Tim Wright <sambo.shacklock@gmail.com> wrote:
                    > To quote from http://www.bigvisible.com/gschlitz/passive-conduit/ (because
                    > Im tired after work :)
                    >
                    > "I believe that one of the simplest and most effective things an Agile
                    > project manager can do is, ironically, nothing!
                    >
                    > "Well, not really *nothing*. But none of the things mentioned above. The
                    > Agile PM should be a conduit of information, a “passive conduit” as Thomsett
                    > describes nicely in his excellent book. Instead of solving problems, focus
                    > on getting problems to the right people. For every challenge, risk and issue
                    > arises, spend your time communicating to those who need to know, those who
                    > are empowered and able to solve the challenge or issue, or who are affected
                    > by the risk."
                    >
                    > Tim
                    >
                    > On Wed, Jan 6, 2010 at 3:28 PM, William Pietri <william@...> wrote:
                    >
                    >>
                    >>
                    >> On 01/05/2010 06:20 PM, Tim Wright wrote:
                    >>
                    >> IT's a slightly different setup than that. The Agile PM has two teams that
                    >> report to him (either through secondment from business or as their
                    >> managers
                    >> - we don't do the matrix resourcing anymore). One is the development team
                    >> and the other is the business experts team. The business experts act more
                    >> like a customer or product owner.
                    >>
                    >> The project is measured (and the PM rewarded) by how well the project
                    >> meets
                    >> several "success sliders" and removes roadblocks that hinder the team
                    >> achieving those measures - as well as identifying external (to the
                    >> project)
                    >> things that might impact the team.
                    >>
                    >>
                    >> Interesting. I'm still a little unclear on what that person actually does.
                    >> You mentioned previously that the project manager is responsible for
                    >> delivery, but in the fully Agile shops I'm familiar with, it's the team
                    >> that
                    >> is responsible.
                    >>
                    >> Just so I can understand their function better, what would happen if you
                    >> didn't have the project manager? If you just had all of those people
                    >> working
                    >> as one team with common goals?
                    >>
                    >> William
                    >>
                    >>
                    >


                    --
                    Glennette Clark
                    Lazy Smart Creative
                    202-683-9508
                    glennette@...

                    UXCamp DC - Jan. 23, 2010 - http://uxbarcampdc.eventbrite.com


                    ------------------------------------

                    Yahoo! Groups Links

                    <*> To visit your group on the web, go to:
                       http://groups.yahoo.com/group/agile-usability/

                    <*> Your email settings:
                       Individual Email | Traditional

                    <*> To change settings online go to:
                       http://groups.yahoo.com/group/agile-usability/join
                       (Yahoo! ID required)

                    <*> To change settings via email:
                       agile-usability-digest@yahoogroups.com
                       agile-usability-fullfeatured@yahoogroups.com

                    <*> To unsubscribe from this group, send an email to:
                       agile-usability-unsubscribe@yahoogroups.com

                    <*> Your use of Yahoo! Groups is subject to:
                       http://docs.yahoo.com/info/terms/





                    --
                    Glennette Clark
                    Lazy Smart Creative
                    202-683-9508
                    glennette@...

                    UXCamp DC - Jan. 23, 2010 - http://uxbarcampdc.eventbrite.com
                  • Jared Spool
                    ... Bored?
                    Message 9 of 18 , Jan 7, 2010
                    • 0 Attachment

                      On Jan 7, 2010, at 6:38 AM, Craig Davidson wrote:

                      What do you call the SCRUM master when you are not doing SCRUM? ;-)

                      Bored?