Loading ...
Sorry, an error occurred while loading the content.

FRAMINGCON - final update

Expand Messages
  • muttstain2
    Looks like the construction on the Winter Street bridge is not going to be finished :( Coming from Route 9 east, take the ramp at Framingham Center as normal.
    Message 1 of 1 , Aug 30, 2013
    • 0 Attachment
      Looks like the construction on the Winter Street bridge is not going to be
      finished :(

      Coming from Route 9 east, take the ramp at Framingham Center as normal.
      Instead of turning right on High Street, continue straight on Main. At light
      right on Franklin. Through double light. At next light, right on Mt Wayte.
      Mt Wayte turns into Dudley. Despite what detour sign says,, right ono Dr.
      Harvey Cushing Way. Right on Winter (around barrier) Then left on Bexley,

      From Rt 9 West, do not turn right at Temple Street or Winter Street.
      Continue to the ramp by Framingham State. At light, right on Main Street and
      follow above.

      Any issues, call me 508-269-1480

      Please remember to park on the RIGHT side of the street.

      I hope to see a lot of you this weekend.

      -Matt

      [Non-text portions of this message have been removed]
    Your message has been successfully submitted and would be delivered to recipients shortly.