Loading ...
Sorry, an error occurred while loading the content.

FW: DC Streetcar Construction Update Significant Impacts July 31 - mid-October

Expand Messages
  • Press, MPD (MPD)
    Government of the District of Columbia Department of Transportation FOR IMMEDIATE RELEASE Tuesday, July 30, 2013 Media Contact: Dara Ward û 202-671-2631,
    Message 1 of 1 , Jul 30, 2013
    • 0 Attachment
       
       
       

      Government of the District of Columbia
      Department of Transportation

       

      FOR IMMEDIATE RELEASE

      Tuesday, July 30, 2013

      Media Contact:  Dara Ward – 202-671-2631, Dara.Ward@...

       

       

      ***TRAFFIC ADVISORY***

       

      DC Streetcar Construction Update

      Significant Impacts July 31 – mid-October

      H Street, NE from the Top of the Hopscotch Bridge to 4th Street, NE

       

      (Washington, D.C.) Construction work along H Street/Benning Road to ready the corridor for DC Streetcar continues. Stage 2 of the Western Turnaround work is set to begin on Wednesday, July 31 and continue through mid-October. The Western Turnaround refers to the extension of the streetcar tracks from 3rd Street, NE to the top of the Hopscotch Bridge. Elements include construction of a streetcar platform where passengers may board or leave the streetcars with access to Union Station and tracks to allow the streetcar to reverse course and proceed eastbound through the corridor.

       

      Most noticeable for motorists traveling in this area will be a shift from using the north side to using the south side of H Street.

       

      Traffic and parking restrictions and changes are as follows:

      ·         At 4th Street, westbound H Street traffic will be shifted to a single lane on the north side. During Stage 1, westbound traffic used a middle lane from 4th Street to the top of Hopscotch Bridge.

      ·        On Hopscotch Bridge, eastbound H Street traffic will be shifted to a single lane in the middle of the roadway to 4th Street. During Stage 1, eastbound traffic used the south curb lane to 4th Street.

      ·        No-Parking restrictions in the 300 and 400 blocks of H Street will continue, just as in Stage 1.

      ·        No-Turn restrictions at 3rd Street will remain in effect for vehicular traffic.

      ·        The 3rd Street crosswalk on the north side of H Street will be open to pedestrian traffic.

      ·        Pedestrian detour signs will be installed for the 3rd Street crosswalk on the south side of H Street and both crosswalks crossing H Street at 3rd Street. Vehicular and pedestrian restrictions at 3rd Street will remain in effect until mid-October.

      ·        The X1/X2 Metrobus stop on the south side of H Street will be temporarily relocated to the mid-500 block, from its current temporary location near 4th Street. Its original location was just west of 3rd Street.

      ·        The X1/X2 Metrobus stop on the north side of H Street will remain at its current temporary location just east of 4th Street for the duration of Stage 2.

      ·        The southbound D8 Metrobus route to Union Station will be rerouted along K Street to North Capitol Street, bypassing the regular stops at 4th & K Streets, 4th & H Streets, and 3rd & H Streets. There will be no change in the northbound D8 route to Washington Hospital Center.

       

      Advance warning signs will be posted in work areas. The schedule is subject to change due to weather, material and equipment availability and other unforeseen conditions.

       

      DDOT encourages all motorists to Stay Alert and follow all signs as they travel through this corridor.

       

      More detailed construction related notices, including specific dates and locations, are available by request. Please send an email to construction@... and indicate you wish to receive H/Benning updates.

       

      For more information about the DC Streetcar, please visit at www.dcstreetcar.com.

       

      ###

       

      DCPS starts up again on August 26th! Enroll your student today by submitting completed forms to your child's school. 

      Need an enrollment form? Visit dcps.dc.gov/enrollHave questions? E-mail enroll@... 


    Your message has been successfully submitted and would be delivered to recipients shortly.