Loading ...
Sorry, an error occurred while loading the content.

13281Re: [FJGRailroad] Run-around

Expand Messages
  • Paul Charland
    Apr 24, 2008
    • 0 Attachment
      Hi Paul,

      Thanks, I wasn't looking forward to cutting another switch into the

      Paul :-)

      Paul Larner wrote:
      > Paul, No siding; there was a short spur installed at the time route
      > 30A was constructed, about 1957. The contractors unloaded there
      > cement there. The track was not removed serving as an unloading
      > location for poles from time to time, and probably other material.
      > Switch points faced south, bunter toward the arterial.
      > PKL
    • Show all 4 messages in this topic