    u use scheduling group concept can be used. each group jobs will be having different jobs with different conditions.But do the same thing repeatedly. In
    Message 1 of 8 , Jul 2, 2011
    • 0 Attachment
      u use scheduling group concept can be used.
      each group jobs will be having different jobs with different conditions.But do the same thing repeatedly.
      In control-m 7 version ..smart table concept..

      i think this could help you ..



      --- In Control-X@yahoogroups.com, "Campbell, Andrew" <Andrew_Campbell@...> wrote:
      >
      >
      > Dimitris,
      >
      > The BIM job throws a bit of a curve ball at this common scenario. What I would try is this :-
      >
      >
      > * Create your 10 real jobs and dummy start job as Cyclic with rerun interval of 1 minute
      >
      > * Create your BIM job as non-cyclic and the "Must complete at" being some HH:MM after order time. Scheduling criteria should be blank.
      >
      > * In your start job go to the STEPS panel and code a "On OK, Do Forcejob" with the BIM job as the target.
      >
      > * Open the Tools -> Options panel on CTM/Desktop, and in the Links section tick the "Add Out Condition with minus sign when creating job dependency
      >
      > * Now use standard drag+click actions to connect your jobs from the Start job down to the BIM job
      >
      > * [Optional enhancement - code "On NOTOK, Do Cond" to delete each jobs' In Conditions just like the Out Conditions panel. This avoids spurious reruns on job failures]
      >
      > When you order this table all the jobs will come in except the BIM job. When the Start job is confirmed the BIM job will appear and the clock will start ticking. The flow should run through to completion and then stop. When you want to go again the ops can do a "Why" on the Start job and then add the In Condition again (this could also be done in batch mode by using ctmcontb or the EM API). A new BIM service will appear with a new deadline and the flow will rerun down to it again.
      >
      > Drawbacks - the Service name is the same. I think there is a fairly simple way to change this but I can't think of it right now and lunch beckons ....
      >
      >
      >
      > Cheers,
      >
      >
      > Andrew
      >
      >
      > From: Control-X@yahoogroups.com [mailto:Control-X@yahoogroups.com] On Behalf Of Dimitris Karistinos
      > Sent: Wednesday, 29 June 2011 19:27
      > To: Control-X@yahoogroups.com
      > Subject: [Control-X] Re-run a set of 10 jobs
      >
      >
      > Hello group,
      > I have a set of 10 jobs that run one after the other ending on a BIM job...The first job on the line is waiting always for manual confirmation
      > They re-present a business service that we have...
      >
      > We need to run this set of jobs 3 or 4 and sometimes 5 times a day....
      > So what we need is when the jobs run once, to turn them again in wait for schedule status (grey).
      > Of course this means that all the condition should be gone....
      >
      > Right now and because this is a user decision about how many times they will re-run, a mail is sent to the admins so they delete the condition and do a re-run on each job....
      >
      > Any ideas about how we can achieve this?
      >