Hi all,
CET is going to have a totally new look with grand steps on the front side of the campus.
The masterplan which includes a wide scale landscaping was presented in the previous CETAA meeting and the work already started with the new steps on the front of the college. (This is sponsored by 1955 batch). The plan includes the two long avenues which extends from LH to MH, one in the front and one in the back of the main building. (hmmm, an interesting change!!!
). Also in the design is big open space landscaping areas in the front side of our college and in the front of the library. Good news for the sports enthusiastics - The sports ground will be totally changed with synthetic track (yes, you heard it right, SYNTHETIC TRACK) and with gallery. May be we can have our 1999 batch get together at the new look CET Campus later this year to commemorate our 10th year of passout!
Regards,
Deepu A S
1999 Mech
050 3420599 |
). Also in the design is big open space landscaping areas in the front side of our college and in the front of the library. Good news for the sports enthusiastics - The sports ground will be totally changed with synthetic track (yes, you heard it right, SYNTHETIC TRACK) and with gallery.